| Area | Permit # | Req | Description | Date |
|---|---|---|---|---|
| 1 | 2011090258 | 600 | SEMI-PERMANENT POWER | May 16, 2012 |
| 1 | 2011120095 | 500 | INSULATION/FULL | May 16, 2012 |
| 1 | 2011120095 | 550 | CEILING CONCEALMENT/FULL | May 16, 2012 |
| 1 | 2012030286 | 490 | ROOF SHEATHING NAILING | May 16, 2012 |
| 1 | 2012030394 | 990 | MOBILE HOME FINAL | May 16, 2012 |
| 1 | 2012030400 | 994 | NEW SERVICE FINAL | May 16, 2012 |
| 1 | 2012030401 | 999 | FINAL INSPECTION | May 16, 2012 |
| 1 | 2012040086 | 990 | MOBILE HOME FINAL | May 16, 2012 |
| 1 | 2012040092 | 999 | FINAL INSPECTION | May 16, 2012 |
| 1 | 2012040093 | 994 | NEW SERVICE FINAL | May 16, 2012 |
| 1 | 2012040134 | 999 | FINAL INSPECTION | May 16, 2012 |
| 1 | 2012040215 | 999 | FINAL INSPECTION | May 16, 2012 |
| 1 | 2012050156 | 999 | FINAL INSPECTION | May 16, 2012 |
| 1 | 2012050198 | 490 | ROOF SHEATHING NAILING | May 16, 2012 |
| 14 Total Inspections for Area | ||||
| Area | Permit # | Req | Description | Date |
|---|---|---|---|---|
| 2 | 2011050005 | 915 | FLOOD PRONE RELEASE | May 16, 2012 |
| 2 | 2011090245 | 890 | GRU GREASE TRAP RELEASE | May 16, 2012 |
| 2 | 2011110130 | 990 | MOBILE HOME FINAL | May 16, 2012 |
| 2 | 2011110131 | 994 | NEW SERVICE FINAL | May 16, 2012 |
| 2 | 2011110132 | 999 | FINAL INSPECTION | May 16, 2012 |
| 2 | 2011120284 | 999 | FINAL INSPECTION | May 16, 2012 |
| 2 | 2012020326 | 500 | INSULATION/FULL | May 16, 2012 |
| 2 | 2012030017 | 220 | ROUGH IN ELECTRICAL | May 16, 2012 |
| 2 | 2012030017 | 600 | SEMI-PERMANENT POWER | May 16, 2012 |
| 2 | 2012030308 | 450 | MECHANICAL FRAMING/FULL | May 16, 2012 |
| 2 | 2012030308 | 460 | ELECTRICAL WALL ROUGH IN | May 16, 2012 |
| 2 | 2012030308 | 470 | PLUMBING WALL ROUGH IN | May 16, 2012 |
| 2 | 2012030372 | 999 | FINAL INSPECTION | May 16, 2012 |
| 2 | 2012040311 | 999 | FINAL INSPECTION | May 16, 2012 |
| 2 | 2012040312 | 999 | FINAL INSPECTION | May 16, 2012 |
| 2 | 2012050031 | 999 | FINAL INSPECTION | May 16, 2012 |
| 2 | 2012050092 | 490 | ROOF SHEATHING NAILING | May 16, 2012 |
| 2 | 2012050093 | 999 | FINAL INSPECTION | May 16, 2012 |
| 2 | 2012050097 | 999 | FINAL INSPECTION | May 16, 2012 |
| 2 | 2012050133 | 490 | ROOF SHEATHING NAILING | May 16, 2012 |
| 2 | 2012050144 | 999 | FINAL INSPECTION | May 16, 2012 |
| 2 | 2012050189 | 250 | STRUCTURAL SLAB/FULL | May 16, 2012 |
| 2 | 2012050202 | 999 | FINAL INSPECTION | May 16, 2012 |
| 23 Total Inspections for Area | ||||
| Area | Permit # | Req | Description | Date |
|---|---|---|---|---|
| 3 | 2011090056 | 400 | STRUCTURAL FRAMING/FULL | May 16, 2012 |
| 3 | 2011100157 | 800 | CHANGE OF SERVICE | May 16, 2012 |
| 3 | 2012020312 | 155 | FOUNDATION FOOTING/PARTIAL | May 16, 2012 |
| 3 | 2012020312 | 155 | FOUNDATION FOOTING/PARTIAL | May 16, 2012 |
| 3 | 2012030043 | 200 | ROUGH IN PLUMBING/FULL | May 16, 2012 |
| 3 | 2012030059 | 200 | ROUGH IN PLUMBING/FULL | May 16, 2012 |
| 3 | 2012030180 | 999 | FINAL INSPECTION | May 16, 2012 |
| 3 | 2012030312 | 430 | SUBCONTRACTOR VERIFICATION REL | May 16, 2012 |
| 3 | 2012040138 | 999 | FINAL INSPECTION | May 16, 2012 |
| 3 | 2012040166 | 999 | FINAL INSPECTION | May 16, 2012 |
| 3 | 2012040252 | 999 | FINAL INSPECTION | May 16, 2012 |
| 3 | 2012040256 | 490 | ROOF SHEATHING NAILING | May 16, 2012 |
| 3 | 2012040262 | 150 | FOUNDATION FOOTING/FULL | May 16, 2012 |
| 3 | 2012040280 | 750 | POOL DECK | May 16, 2012 |
| 3 | 2012040380 | 999 | FINAL INSPECTION | May 16, 2012 |
| 3 | 2012040391 | 999 | FINAL INSPECTION | May 16, 2012 |
| 3 | 2012050015 | 999 | FINAL INSPECTION | May 16, 2012 |
| 3 | 2012050018 | 430 | SUBCONTRACTOR VERIFICATION REL | May 16, 2012 |
| 3 | 2012050018 | 250 | STRUCTURAL SLAB/FULL | May 16, 2012 |
| 3 | 2012050020 | 250 | STRUCTURAL SLAB/FULL | May 16, 2012 |
| 3 | 2012050020 | 430 | SUBCONTRACTOR VERIFICATION REL | May 16, 2012 |
| 3 | 2012050153 | 993 | WELL SERVICE FINAL | May 16, 2012 |
| 22 Total Inspections for Area | ||||
| Area | Permit # | Req | Description | Date |
|---|---|---|---|---|
| 4 | 2010060182 | 999 | FINAL INSPECTION | May 16, 2012 |
| 4 | 2010060182 | 985 | CHECK JOB PER B.O. | May 16, 2012 |
| 4 | 2011040230 | 999 | FINAL INSPECTION | May 16, 2012 |
| 4 | 2011120050 | 400 | STRUCTURAL FRAMING/FULL | May 16, 2012 |
| 4 | 2012020035 | 500 | INSULATION/FULL | May 16, 2012 |
| 5 Total Inspections for Area | ||||
STR 16-10-20
| REQ | DESCRIPTION | REQUEST DATE | RESULT | RESULT DATE | INSPECTOR |
|---|---|---|---|---|---|
| 490 | ROOF SHEATHING NAILING | 07-DEC-11 | 90 | 07-DEC-11 | BLD092 |
| 400 | STRUCTURAL FRAMING/FULL | 06-DEC-11 | 75 | 06-DEC-11 | BLD092 |
* INSPECTION DONE @ SANTA FE COLLEGE |
|||||
| 405 | STRUCTURAL FRAMING/PARTIAL | 07-DEC-11 | 92 | 07-DEC-11 | BLD092 |
OK TO WRAP WALLS. |
|||||
| 470 | PLUMBING WALL ROUGH IN | 19-JAN-12 | 90 | 19-JAN-12 | BLD092 |
| 460 | ELECTRICAL WALL ROUGH IN | 19-JAN-12 | 90 | 19-JAN-12 | BLD092 |
| 450 | MECHANICAL FRAMING/FULL | 19-JAN-12 | 90 | 19-JAN-12 | BLD092 |
* INSPECTION DONE @ SANTA FE COLLEGE |
|||||
| 400 | STRUCTURAL FRAMING/FULL | 19-JAN-12 | 90 | 19-JAN-12 | BLD092 |
| 405 | STRUCTURAL FRAMING/PARTIAL | 26-JAN-12 | 90 | 26-JAN-12 | BLD092 |
THIS IS FOR WINDOWS AND DOORS. BUILDING IS AT SANTA FE COLLEGE. |
|||||
| 150 | FOUNDATION FOOTING/FULL | 27-JAN-12 | 90 | 27-JAN-12 | BLD072 |
| 500 | INSULATION/FULL | 31-JAN-12 | 90 | 31-JAN-12 | BLD092 |
* INSPECTION DONE @ SANTA FE COLLEGE |
|||||
| 300 | LINTEL-TIE BEAM/FULL | 19-APR-12 | 90 | 19-APR-12 | BLD232 |
THIS IS A REINSPECTION
-RECIVED AFFIDAVIT FROM CONTRACTOR AND MET ONSITE WITH ENGINEER OF RECORD. HE HAS SUBMITTED A LETTER FOR THE JOB FILE CONFIRMING THAT THE STEM WALL CONSTRUCTION MEETS ALL DESIGN CRITERIA...JCF |
|||||
| 300 | LINTEL-TIE BEAM/FULL | 09-FEB-12 | 81 | 09-FEB-12 | BLD072 |
NEED HOOK ON DOWELS AT LINTEL WHAT ABOUT CRAWL SPACE VENTS??? |
|||||
| 550 | CEILING CONCEALMENT/FULL | ||||
* INSPECTION DONE @ SANTA FE COLLEGE |
|||||
| 230 | ROUGH IN CRAWL SPACE | 07-MAY-12 | 90 | 07-MAY-12 | BLD142 |
THIS IS A REINSPECTION
1.PORCH ROOF SHEATHING ALSO. |
|||||
| 100 | TEMPORARY POWER POLE | 07-MAR-12 | 90 | 07-MAR-12 | BLD072 |
| 230 | ROUGH IN CRAWL SPACE | 04-MAY-12 | 74 | 04-MAY-12 | BLD142 |
-NEED INSPECTION ON THE PORCH SHEATHING, THE TIE DOWNS TO THE FOUNDATION WALL AND THE PLUMBING...PLEASE CALL CAROL @ 316-3703 IF YOU NEED ANYTHING |
|||||
| 430 | SUBCONTRACTOR VERIFICATION REL | ||||
| 600 | SEMI-PERMANENT POWER | 16-MAY-12 | 90 | 16-MAY-12 | BLD142 |
| 900 | HEALTH DEPARTMENT RELEASE | ||||
| 910 | CO ENGINEERS RELEASE | ||||
SWALE AND DRAINAGE INSPECTION INCLUDED PER PUBLIC WORKS (RON FOLMER) |
|||||
| 985 | CHECK JOB PER B.O. | ||||
10 IPF |
|||||
| 999 | FINAL INSPECTION | ||||
STR 09-10-20
| REQ | DESCRIPTION | REQUEST DATE | RESULT | RESULT DATE | INSPECTOR |
|---|---|---|---|---|---|
| 450 | MECHANICAL FRAMING/FULL | 13-APR-12 | 90 | 13-APR-12 | BLD072 |
ALSO WANT THE CEILING CONCEALMENT INSPECTION |
|||||
| 460 | ELECTRICAL WALL ROUGH IN | 13-APR-12 | 90 | 13-APR-12 | BLD072 |
| 500 | INSULATION/FULL | 16-MAY-12 | 90 | 16-MAY-12 | BLD142 |
| 550 | CEILING CONCEALMENT/FULL | 16-MAY-12 | 90 | 16-MAY-12 | BLD142 |
| 920 | FIRE MARSHAL RELEASE | ||||
| 985 | CHECK JOB PER B.O. | ||||
| 999 | FINAL INSPECTION | ||||
STR 09-10-20
| REQ | DESCRIPTION | REQUEST DATE | RESULT | RESULT DATE | INSPECTOR |
|---|---|---|---|---|---|
| 450 | MECHANICAL FRAMING/FULL | 13-APR-12 | 90 | 13-APR-12 | BLD072 |
ALSO WANT THE CEILING CONCEALMENT INSPECTION |
|||||
| 460 | ELECTRICAL WALL ROUGH IN | 13-APR-12 | 90 | 13-APR-12 | BLD072 |
| 500 | INSULATION/FULL | 16-MAY-12 | 90 | 16-MAY-12 | BLD142 |
| 550 | CEILING CONCEALMENT/FULL | 16-MAY-12 | 90 | 16-MAY-12 | BLD142 |
| 920 | FIRE MARSHAL RELEASE | ||||
| 985 | CHECK JOB PER B.O. | ||||
| 999 | FINAL INSPECTION | ||||
STR 11-10-20
| REQ | DESCRIPTION | REQUEST DATE | RESULT | RESULT DATE | INSPECTOR |
|---|---|---|---|---|---|
| 490 | ROOF SHEATHING NAILING | 16-MAY-12 | 90 | 16-MAY-12 | BLD142 |
| 999 | FINAL INSPECTION |
STR 02-10-21
| REQ | DESCRIPTION | REQUEST DATE | RESULT | RESULT DATE | INSPECTOR |
|---|---|---|---|---|---|
| 900 | HEALTH DEPARTMENT RELEASE | 14-MAY-12 | 90 | 14-MAY-12 | INS992 |
# 03-146-12 APPROVED 300 GPD FILLED SYSTEM. |
|||||
| 990 | MOBILE HOME FINAL | 16-MAY-12 | 99 | 16-MAY-12 | BLD142 |
STR 02-10-21
| REQ | DESCRIPTION | REQUEST DATE | RESULT | RESULT DATE | INSPECTOR |
|---|---|---|---|---|---|
| 994 | NEW SERVICE FINAL | 16-MAY-12 | 99 | 16-MAY-12 | BLD142 |
STR 02-10-21
| REQ | DESCRIPTION | REQUEST DATE | RESULT | RESULT DATE | INSPECTOR |
|---|---|---|---|---|---|
| 999 | FINAL INSPECTION | 16-MAY-12 | 99 | 16-MAY-12 | BLD142 |
STR 00-11-20
| REQ | DESCRIPTION | REQUEST DATE | RESULT | RESULT DATE | INSPECTOR |
|---|---|---|---|---|---|
| 900 | HEALTH DEPARTMENT RELEASE | 14-MAY-12 | 90 | 14-MAY-12 | INS992 |
# 04-152-12 APPROVED 300 GPD MOUND WITH LIFT DOSING (PUMP). |
|||||
| 990 | MOBILE HOME FINAL | 16-MAY-12 | 81 | 16-MAY-12 | BLD142 |
1.INSULATE WATER SUPPLY PIPING.
2.SUPPORT DRAIN PIPING NW CORNER FOR CORRECT FALL. |
|||||
| 990 | MOBILE HOME FINAL | ||||
THIS IS A REINSPECTION |
|||||
STR 00-11-20
| REQ | DESCRIPTION | REQUEST DATE | RESULT | RESULT DATE | INSPECTOR |
|---|---|---|---|---|---|
| 999 | FINAL INSPECTION | 16-MAY-12 | 99 | 16-MAY-12 | BLD142 |
STR 00-11-20
| REQ | DESCRIPTION | REQUEST DATE | RESULT | RESULT DATE | INSPECTOR |
|---|---|---|---|---|---|
| 994 | NEW SERVICE FINAL | 16-MAY-12 | 81 | 16-MAY-12 | BLD142 |
1.OK PENDING HOME APPROVAL. |
|||||
| 994 | NEW SERVICE FINAL | ||||
THIS IS A REINSPECTION |
|||||
STR 01-10-20
| REQ | DESCRIPTION | REQUEST DATE | RESULT | RESULT DATE | INSPECTOR |
|---|---|---|---|---|---|
| 999 | FINAL INSPECTION | 16-MAY-12 | 99 | 16-MAY-12 | BLD142 |
THIS IS A REINSPECTION
HE WOULD PREFER INSPECTION AFTER 2 PM & ONE HOUR NOTICE 792-5757 THANK YOU |
|||||
| 999 | FINAL INSPECTION | 18-APR-12 | 75 | 18-APR-12 | CDM162 |
NOTES FROM APPLICANT: "PLEASE CALL THE CUSTOMER 45 MINS AHEAD SO HE CAN HEAD HOME TO MEET YOU.
THANK YOU!" CELL # 352-792-5757 |
|||||
| 999 | FINAL INSPECTION | 26-APR-12 | 82 | 26-APR-12 | BLD072 |
THIS IS A REINSPECTION
NOTES FROM APPLICANT: "PLEASE CALL THE CUSTOMER AN HOUR AHEAD SO HE HAS ENOUGH TIME TO MEET YOU, LEE 792-5757.MUST PROTECT INSULATION ON LNE SET OUTSIDE
THANKS!" |
|||||
STR 00-10-19
| REQ | DESCRIPTION | REQUEST DATE | RESULT | RESULT DATE | INSPECTOR |
|---|---|---|---|---|---|
| 999 | FINAL INSPECTION | 16-MAY-12 | 99 | 16-MAY-12 | BLD142 |
NOTES FROM APPLICANT: "CUSTOMER HAS REQUESTED AFTERNOON INSPECTION IF POSSIBLE." |
|||||
STR 00-10-19
| REQ | DESCRIPTION | REQUEST DATE | RESULT | RESULT DATE | INSPECTOR |
|---|---|---|---|---|---|
| 999 | FINAL INSPECTION | 16-MAY-12 | 81 | 16-MAY-12 | BLD142 |
GAS AND WATER PIPING NEEDS TO BE BONDED |
|||||
| 999 | FINAL INSPECTION | 17-MAY-12 | |||
THIS IS A REINSPECTION |
|||||
STR 11-11-19
| REQ | DESCRIPTION | REQUEST DATE | RESULT | RESULT DATE | INSPECTOR |
|---|---|---|---|---|---|
| 490 | ROOF SHEATHING NAILING | 16-MAY-12 | 90 | 16-MAY-12 | BLD142 |
| 999 | FINAL INSPECTION |
STR 17-10-19
| REQ | DESCRIPTION | REQUEST DATE | RESULT | RESULT DATE | INSPECTOR |
|---|---|---|---|---|---|
| 100 | TEMPORARY POWER POLE | 15-JUN-11 | 90 | 16-JUN-11 | BLD072 |
| 200 | ROUGH IN PLUMBING/FULL | 15-JUN-11 | 90 | 16-JUN-11 | BLD072 |
| 255 | STRUCTURAL SLAB/PARTIAL | 23-JUN-11 | 90 | 23-JUN-11 | BLD092 |
AS REQUESTED, REVISED POST-TENSION ENG. SUBMITTED 6/22/11 JKJ |
|||||
| 250 | STRUCTURAL SLAB/FULL | 29-JUN-11 | 90 | 29-JUN-11 | BLD072 |
NOTES FROM APPLICANT: "CALL MARK FARRIS FOR QUESTIONS AT 352-258-1883."
REC'V'D POST-TENSION ENGINEERING REVISIONS 6/29/11 JKJ |
|||||
| 320 | POURED CELLS/FULL | 06-JUL-11 | 90 | 06-JUL-11 | BLD092 |
PER CONTRACTOR REQUEST |
|||||
| 300 | LINTEL-TIE BEAM/FULL | 06-JUL-11 | 90 | 06-JUL-11 | BLD092 |
| 490 | ROOF SHEATHING NAILING | 21-JUL-11 | 90 | 21-JUL-11 | BLD072 |
NOTES FROM APPLICANT: "PLEASE CHECK WALL NAIL-OFF ALSO.
THANKS,
MARK FARRIS" WALLS OK NO WINDOWS |
|||||
| 400 | STRUCTURAL FRAMING/FULL | 13-SEP-11 | 75 | 12-SEP-11 | WEBUSER |
NOTES FROM APPLICANT: "ALL WINDOWS / DOORS IN EXCEPT ENTRY DOORS AND TRANSOMS ABOVE WHICH ARE SEVERAL WEEKS OUT STILL. THANKS,
MARK"
NOTES FROM APPLICANT: "ALL WINDOWS / DOORS IN EXCEPT ENTRY DOORS AND TRANSOMS ABOVE WHICH ARE SEVERAL WEEKS OUT STILL. THANKS,
MARK" |
|||||
| 400 | STRUCTURAL FRAMING/FULL | 14-SEP-11 | 90 | 14-SEP-11 | BLD072 |
THIS IS A REINSPECTION |
|||||
| 450 | MECHANICAL FRAMING/FULL | 03-NOV-11 | 92 | 03-NOV-11 | BLD152 |
SUBMITTED AS-BUILT DUCT LAYOUT FROM BERTIE H & A 11/2/11 JKJ.
SEAL CONDUITS USED AS STAKES ; PRESSURIZE GAS PIPING AND BOND BY SEMI; NEED REVISION OF FLOOR PLAN SHOWING 1/2 BATH(?) IN LAUNDRY AREA |
|||||
| 500 | INSULATION/FULL | 14-NOV-11 | 92 | 14-NOV-11 | BLD152 |
THIS IS A REINSPECTION
NEED CERT ON BLOWN AT FINAL |
|||||
| 500 | INSULATION/FULL | 10-NOV-11 | 75 | 09-NOV-11 | WEBUSER |
NOTES FROM APPLICANT: "CONDUITS SEALED, GAS BOND BEHIND EAST GARAGE @ TANKLESS HEATER LOCATION, GAS PRESSURE VALVE BEHIND WEST GARAGE BY PEDESTRIAN DOOR, ADDED POWDER BATH DRAWINGS WILL BE SUBMITTED BY THURSDAY 11/10. THANKS, MARK"
NOTES FROM APPLICANT: "CONDUITS SEALED, GAS BOND BEHIND EAST GARAGE @ TANKLESS HEATER LOCATION, GAS PRESSURE VALVE BEHIND WEST GARAGE BY PEDESTRIAN DOOR, ADDED POWDER BATH DRAWINGS WILL BE SUBMITTED BY THURSDAY 11/10. THANKS, MARK" |
|||||
| 550 | CEILING CONCEALMENT/FULL | 21-NOV-11 | 75 | 21-NOV-11 | CDM162 |
| 550 | CEILING CONCEALMENT/FULL | 22-NOV-11 | 90 | 22-NOV-11 | BLD152 |
THIS IS A REINSPECTION |
|||||
| 600 | SEMI-PERMANENT POWER | 09-APR-12 | 90 | 09-APR-12 | BLD092 |
| 915 | FLOOD PRONE RELEASE | 16-MAY-12 | 92 | 16-MAY-12 | PLX042 |
MINIMUM FINISHED FLOOR ELEVATION = 93.00'
PER PISTORINO FAX: FFE = 96.10' |
|||||
| 985 | CHECK JOB PER B.O. | ||||
| 999 | FINAL INSPECTION | ||||
STR 16-10-19
| REQ | DESCRIPTION | REQUEST DATE | RESULT | RESULT DATE | INSPECTOR |
|---|---|---|---|---|---|
| 100 | TEMPORARY POWER POLE | 25-OCT-11 | 92 | 25-OCT-11 | BLD152 |
NOTES FROM APPLICANT: "SUPER: LENE' MOLLBERG"
EITHER REMOVE 240 VOLT RECEP OR PROVIDE GFCI PROTECTION |
|||||
| 200 | ROUGH IN PLUMBING/FULL | 07-NOV-11 | 90 | 07-NOV-11 | BLD142 |
| 250 | STRUCTURAL SLAB/FULL | 15-NOV-11 | 91 | 15-NOV-11 | BLD142 |
NOTES FROM APPLICANT: "PLEASE INSPECT THE FOLLOWING:
1) FOUNDATION AND SLAB REINFORCING
2) SLAB VAPOR BARRIER
3) ELECTRICAL GROUNDING
4) POTABLE WATER STUB-IN AND TRAP PRIMER PIPING
WE WOULD APPRECIATE THE INSPECTION IN THE PM IF POSSIBLE. THANKS!" |
|||||
| 250 | STRUCTURAL SLAB/FULL | 30-NOV-11 | 90 | 30-NOV-11 | BLD152 |
THIS IS A REINSPECTION
NOTES FROM APPLICANT: "WE WOULD APPRECIATE A PM INSPECTION OF THE WEST AND EAST PORCHES FOUNDATION REINFORCING, SLAB REINFORCING, AND VAPOR BARRIER. THANKS" EAST AND WEST PORCHES - JUDY |
|||||
| 320 | POURED CELLS/FULL | 30-NOV-11 | 91 | 30-NOV-11 | BLD152 |
UP TO 7 COURSES - JUDY |
|||||
| 320 | POURED CELLS/FULL | 02-DEC-11 | 81 | 02-DEC-11 | BLD072 |
THIS IS A REINSPECTION
NOTES FROM APPLICANT: "WE WOULD LIKE TO REQUEST A PM INSPECTION ON THE POTABLE WATER LINE BETWEEN THE BUILDING AND THE METER. WE WILL HAVE THE WATER LINE UNDER PRESSURE FOR THE INSPECTION. WE WOULD ALSO APPRECIATE A PM INSPECTION ON THE SANITARY PIPING BETWEEN THE BUILDING AND THE GREASE TRAP" |
|||||
| 205 | ROUGH IN PLUMBING/PARTIAL | 06-DEC-11 | 90 | 06-DEC-11 | BLD152 |
SEWR LINE TIE IN FROM BLDG TO GREASE TRAP |
|||||
| 320 | POURED CELLS/FULL | 06-DEC-11 | 91 | 06-DEC-11 | BLD152 |
THIS IS A REINSPECTION
REBAR 2ND LIFT ON EXT CMU WALLS AND COLUMNS; ALSO LOOKED AT EXPOXIED DOWELS FOR ICF WALLS - JUDY |
|||||
| 300 | LINTEL-TIE BEAM/FULL | 09-DEC-11 | 91 | 09-DEC-11 | BLD152 |
LINTEL ON EXT CMU WALLS; WILL NEED ANOTHER LINTEL/BOND ON ICF WALLS - JUDY |
|||||
| 320 | POURED CELLS/FULL | 09-DEC-11 | 91 | 09-DEC-11 | BLD152 |
THIS IS A REINSPECTION ALL EXTERIOR CMU WALLS; WILL NEED ANOTHER POURED CELLS ON ICF WALLS - JUDY |
|||||
| 320 | POURED CELLS/FULL | 14-DEC-11 | 91 | 14-DEC-11 | BLD072 |
THIS IS A REINSPECTION
NOTES FROM APPLICANT: "2ND LIFT INTERIOR WALLS" |
|||||
| 320 | POURED CELLS/FULL | 15-DEC-11 | 91 | 15-DEC-11 | BLD152 |
THIS IS A REINSPECTION
NOTES FROM APPLICANT: "1ST INTERIOR WALLS
A.M. INSPECTION REQUESTED IF POSSIBLE. THANKS"
INT CMU WALLS TO 56" AFF - JUDY |
|||||
| 320 | POURED CELLS/FULL | 16-DEC-11 | 90 | 16-DEC-11 | BLD142 |
THIS IS A REINSPECTION
NOTES FROM APPLICANT: "2ND LIFT INT WALLS & 3RD LIFT INT. WALLS. A.M. INSPECTION REQUESTED. THANKS" |
|||||
| 300 | LINTEL-TIE BEAM/FULL | 21-DEC-11 | 91 | 21-DEC-11 | BLD072 |
NOTES FROM APPLICANT: "TOP LIFT & BOND BEAM PARTIAL A.M. IF POSSIBLE. THANK YOU !" |
|||||
| 300 | LINTEL-TIE BEAM/FULL | 22-DEC-11 | 91 | 25-DEC-11 | BLD072 |
THIS IS A REINSPECTION
NOTES FROM APPLICANT: "INSPECT STEEL FOR ICF WALLS TO 12'
LATE A.M. INSPECTION REQUESTED IF POSSIBLE THANKS !!!" |
|||||
| 300 | LINTEL-TIE BEAM/FULL | 28-DEC-11 | 90 | 28-DEC-11 | BLD072 |
THIS IS A REINSPECTION
NOTES FROM APPLICANT: "FINAL LIFT COLUMNS. A.M. INSPECTION IF POSSIBLE THANK YOU !!! LT" |
|||||
| 150 | FOUNDATION FOOTING/FULL | 30-DEC-11 | 90 | 30-DEC-11 | BLD152 |
NOTES FROM APPLICANT: "FOOTER INSPECTION FOR COLUMN FOOTINGS. A.M. IF POSSIBLE THANKS LT"
2 COLUMN PADS SOUTH SIDE OF BLDG - JUDY |
|||||
| 310 | CONCRETE COLUMNS/FULL | 04-JAN-12 | 91 | 04-JAN-12 | BLD152 |
NOTES FROM APPLICANT: "PARTIAL ICF COLUMN POUR A.M.INSPECTION IF POSSIBLE THANKS, LT"
ICF WING WALL SOUTH SIDE TO 12' |
|||||
| 310 | CONCRETE COLUMNS/FULL | 05-JAN-12 | 90 | 06-JAN-12 | BLD152 |
THIS IS A REINSPECTION
NOTES FROM APPLICANT: "ICF WALLS 12 FT. TO 20 FT. P.M. INSPECTION IF POSSIBLE THANKS! LT"
WING WALL AND LOBBY TO 20'- JUDY |
|||||
| 320 | POURED CELLS/FULL | 24-JAN-12 | 90 | 24-JAN-12 | BLD152 |
NOTES FROM APPLICANT: "FINAL CELL FILL @ COLUMN & ICF WALLS"
WING WALLS NORTHSIDE |
|||||
| 310 | CONCRETE COLUMNS/FULL | 24-JAN-12 | 90 | 24-JAN-12 | BLD152 |
| 490 | ROOF SHEATHING NAILING | 08-FEB-12 | 91 | 08-FEB-12 | BLD072 |
FLAT ROOF KNEE WALL |
|||||
| 490 | ROOF SHEATHING NAILING | 24-FEB-12 | 90 | 24-FEB-12 | BLD072 |
| 400 | STRUCTURAL FRAMING/FULL | 28-FEB-12 | 91 | 28-FEB-12 | BLD072 |
NOTES FROM APPLICANT: "PARTIAL STRUCTURAL FRAMING" PORCHS AND FOYER |
|||||
| 555 | CEILING CONCEALMENT/PARTIAL | 01-MAR-12 | 90 | 01-MAR-12 | BLD092 |
OSB ATTACHMENT AT WEST PORCH AREA. |
|||||
| 400 | STRUCTURAL FRAMING/FULL | 01-MAR-12 | 90 | 01-MAR-12 | BLD092 |
NOTES FROM APPLICANT: "WALL & CEILING SHEATHING / NAILING A.M. REQUESTED"(OSB FASTENING ON PARAPET AT ROOF.) |
|||||
| 555 | CEILING CONCEALMENT/PARTIAL | 06-MAR-12 | 91 | 06-MAR-12 | BLD072 |
NOTES FROM APPLICANT: "CEILING CONCEALMENT/ PARTIAL" |
|||||
| 380 | WALL TIE AND FLASHING | 09-MAR-12 | 91 | 09-MAR-12 | BLD072 |
NOTES FROM APPLICANT: "METAL LATHE FASTE |
|||||
| 405 | STRUCTURAL FRAMING/PARTIAL | 08-MAR-12 | 90 | 08-MAR-12 | BLD072 |
THIS IS A REINSPECTION "WINDOW ATTATCHMENT |
|||||
| 400 | STRUCTURAL FRAMING/FULL | 12-MAR-12 | 90 | 12-MAR-12 | BLD152 |
| 380 | WALL TIE AND FLASHING | 12-MAR-12 | 90 | 12-MAR-12 | BLD152 |
THIS IS A REINSPECTION
NOTES FROM APPLICANT: "STRUCTURAL FRAMING FULL / METAL LATHE ATTATCHMENT (PARTIAL)" |
|||||
| 460 | ELECTRICAL WALL ROUGH IN | 12-MAR-12 | 91 | 12-MAR-12 | BLD152 |
ELEC ONLY - EAST END |
|||||
| 405 | STRUCTURAL FRAMING/PARTIAL | 14-MAR-12 | 90 | 14-MAR-12 | BLD092 |
NOTES FROM APPLICANT: "WINDOW ATTATCHMENT / METAL LATHE ATTATCHMENT (PARTISL)"(BALANCE OF WINDOWS.) |
|||||
| 380 | WALL TIE AND FLASHING | 14-MAR-12 | 91 | 14-MAR-12 | BLD092 |
ALL OF NORTH SIDE AND PART OF EAST SIDE AND AROUND WINDOWS ON CLERESTROY. |
|||||
| 380 | WALL TIE AND FLASHING | 15-MAR-12 | 90 | 15-MAR-12 | BLD092 |
THIS IS A REINSPECTION
NOTES FROM APPLICANT: "METAL LATHE ATTATCHMENT (PARTIAL)" |
|||||
| 460 | ELECTRICAL WALL ROUGH IN | 16-MAR-12 | 91 | 16-MAR-12 | BLD152 |
ELEC ABOVE CEILING IN RESTROOMS, CONCESSION AREA. |
|||||
| 200 | ROUGH IN PLUMBING/FULL | 02-APR-12 | 81 | 02-APR-12 | BLD072 |
THIS IS A REINSPECTION
NOTES FROM APPLICANT: "FOOTER @ SIGN WALL" SPOKE TO BENNY BECKHAM NEED SIGN PERMIT |
|||||
| 200 | ROUGH IN PLUMBING/FULL | 16-MAR-12 | 91 | 16-MAR-12 | BLD152 |
PLUMBING ABOVE CEILING IN RESTROOMS, CONCESSION AREA - PRESSURE TEST OK. NEED TO BOND COPPER WATER SERVICE AND INSULATE.ALSO MUST PROVIDE ACCESS TO ALL VALVES ABOVE CEILING IN THESE AREAS. JUDY |
|||||
| 380 | WALL TIE AND FLASHING | 16-MAR-12 | 90 | 16-MAR-12 | BLD152 |
NOTES FROM APPLICANT: "PLUMBING ROUGH-IN, PRESSURE TEST / ELECTRICAL ROUGH-IN / ABOVE CEILING. METAL LATHE ATTATCHMENT"
COMPLETES ALL WALL TIE/FLASHING - JUDY |
|||||
| 460 | ELECTRICAL WALL ROUGH IN | 20-MAR-12 | 90 | 20-MAR-12 | BLD072 |
THIS IS A REINSPECTION
NOTES FROM APPLICANT: "PLUMBING, PIPE INSULATION / DRYWALL ATTATCHMENT" |
|||||
| 300 | LINTEL-TIE BEAM/FULL | 05-APR-12 | 90 | 05-APR-12 | BLD092 |
| 320 | POURED CELLS/FULL | 05-APR-12 | 90 | 05-APR-12 | BLD092 |
THIS IS A REINSPECTION
NOTES FROM APPLICANT: "REBAR @ MASONRY SIGN (WALL)"
FREE-STANDING SIGN IS INTERNAL (NOT VISIBLE FROM PUBLIC WAY), WALL CONSTRUCTION/INSPECTIONS PART OF THIS PERMIT, SIGNAGE DOES NOT REQUIRE SEPARATE PERMIT PER B.BECKHAM 4/6/12. |
|||||
| 600 | SEMI-PERMANENT POWER | 30-APR-12 | 90 | 30-APR-12 | BLD072 |
NOTES FROM APPLICANT: "600 PERMANENT POWER" |
|||||
| 550 | CEILING CONCEALMENT/FULL | 14-MAY-12 | 90 | 14-MAY-12 | BLD072 |
NOTES FROM APPLICANT: "CEILING CONCEALMENT /FULL" |
|||||
| 550 | CEILING CONCEALMENT/FULL | ||||
| 600 | SEMI-PERMANENT POWER | ||||
| 890 | GRU GREASE TRAP RELEASE | 16-MAY-12 | 92 | 16-MAY-12 | PLX042 |
REC'V'D EVALUATION FORM |
|||||
| 910 | CO ENGINEERS RELEASE | ||||
| 920 | FIRE MARSHAL RELEASE | ||||
| 975 | ASSEMBLY OCCUPANCY SIGN | ||||
| 985 | CHECK JOB PER B.O. | ||||
44 IPF |
|||||
| 999 | FINAL INSPECTION | ||||
STR 15-10-19
| REQ | DESCRIPTION | REQUEST DATE | RESULT | RESULT DATE | INSPECTOR |
|---|---|---|---|---|---|
| 990 | MOBILE HOME FINAL | 20-APR-12 | 81 | 20-APR-12 | BLD092 |
THE KEY IS IN THE PERMIT BAG ON THE FRONT DOOR.(SANATARY TEES ARE TO BE INSTALLED FROM HORIZONTAL TO VERTICAL ONLY. GUARD ON FRONT DECK TO BE AT LEAST 36 INCHES HIGH. STOPPING INSPECTION NOT READY.) |
|||||
| 990 | MOBILE HOME FINAL | ||||
THIS IS A REINSPECTION |
|||||
| 990 | MOBILE HOME FINAL | 16-MAY-12 | |||
THIS IS A REINSPECTION
NOTES FROM APPLICANT: "KEY IS IN THE PERMIT BAG" |
|||||
STR 15-10-19
| REQ | DESCRIPTION | REQUEST DATE | RESULT | RESULT DATE | INSPECTOR |
|---|---|---|---|---|---|
| 994 | NEW SERVICE FINAL | 16-MAY-12 | |||
THIS IS A REINSPECTION |
|||||
| 994 | NEW SERVICE FINAL | 20-APR-12 | 81 | 20-APR-12 | BLD092 |
KEY IS IN THE PERMIT BAG ON THE FRONT DOOR (UNABLE TO DETERMINE BURIAL DEPTH ON CONDUCTORS TO MOBLIE HOME, INSTALL SITE PIPES. EXPOSE GROUND RODS.) |
|||||
STR 15-10-19
| REQ | DESCRIPTION | REQUEST DATE | RESULT | RESULT DATE | INSPECTOR |
|---|---|---|---|---|---|
| 999 | FINAL INSPECTION | 16-MAY-12 | |||
THIS IS A REINSPECTION |
|||||
| 999 | FINAL INSPECTION | 20-APR-12 | 81 | 20-APR-12 | BLD092 |
KEY IS IN THE PERMIT BAG ON THE FRONT DOOR.(DUCT WORK CANNOT BE IN CONTACT WITH THE GROUND. SUPPORT DUCT WORK.) |
|||||
STR 19-10-19
| REQ | DESCRIPTION | REQUEST DATE | RESULT | RESULT DATE | INSPECTOR |
|---|---|---|---|---|---|
| 999 | FINAL INSPECTION | 16-MAY-12 | |||
THIS IS A REINSPECTION
NOTES FROM APPLICANT: "HOMEOWNER SAYS NEED EARLIEST POSSIBLE INSPECTION OR NO ONE WILL BE HOME & 30 MIN CALL AHEAD 352-316-3156. THANKS MIKE. I DIDN'T MAKE ANY PROMISES BUT HE WAS ADAMANT ABOUT NO ONE BEING HOME IF LATE." |
|||||
| 999 | FINAL INSPECTION | 27-MAR-12 | 81 | 27-MAR-12 | BLD092 |
CHICKASAW WAY
NOTES FROM APPLICANT: "PLEASE SCHEDULE AM INSPECTION, OR CALL MID-FLA (352 377 4414) WITH A TIMEFRAME"(11:05 NO ONE HOME.) |
|||||
STR 32-10-19
| REQ | DESCRIPTION | REQUEST DATE | RESULT | RESULT DATE | INSPECTOR |
|---|---|---|---|---|---|
| 100 | TEMPORARY POWER POLE | 08-MAR-12 | 90 | 08-MAR-12 | BLD092 |
| 200 | ROUGH IN PLUMBING/FULL | 14-MAR-12 | 90 | 14-MAR-12 | BLD072 |
| 250 | STRUCTURAL SLAB/FULL | 16-MAR-12 | 90 | 16-MAR-12 | BLD152 |
| 490 | ROOF SHEATHING NAILING | 13-APR-12 | 90 | 13-APR-12 | BLD072 |
| 400 | STRUCTURAL FRAMING/FULL | 18-APR-12 | 90 | 18-APR-12 | BLD072 |
| 450 | MECHANICAL FRAMING/FULL | 08-MAY-12 | 92 | 08-MAY-12 | BLD142 |
THIS IS A REINSPECTION
1.NEEDS NEW DUCT LAYOUT.
2.REPAIR STUD IN KIT. WALL. |
|||||
| 450 | MECHANICAL FRAMING/FULL | 08-MAY-12 | 75 | 08-MAY-12 | WEBUSER |
| 500 | INSULATION/FULL | 14-MAY-12 | 75 | 14-MAY-12 | BLD072 |
| 500 | INSULATION/FULL | 16-MAY-12 | |||
THIS IS A REINSPECTION |
|||||
| 500 | INSULATION/FULL | ||||
THIS IS A REINSPECTION |
|||||
| 550 | CEILING CONCEALMENT/FULL | ||||
| 600 | SEMI-PERMANENT POWER | ||||
| 910 | CO ENGINEERS RELEASE | ||||
| 985 | CHECK JOB PER B.O. | ||||
VERIFY ALL FEES HAVE BEEN PAID |
|||||
| 999 | FINAL INSPECTION | ||||
STR 16-10-19
| REQ | DESCRIPTION | REQUEST DATE | RESULT | RESULT DATE | INSPECTOR |
|---|---|---|---|---|---|
| 220 | ROUGH IN ELECTRICAL | 16-MAY-12 | 90 | 16-MAY-12 | BLD092 |
THIS IS A REINSPECTION.
ALSO SEE FOUNDATION PER ENGINEER'S REPORT SUBMITTED 4/9/12 JKJ. |
|||||
| 220 | ROUGH IN ELECTRICAL | 21-MAR-12 | 91 | 21-MAR-12 | BLD092 |
IN PROGRESS. |
|||||
| 600 | SEMI-PERMANENT POWER | 16-MAY-12 | 90 | 16-MAY-12 | BLD092 |
SOCCOR FIELD LIGHTING |
|||||
| 999 | FINAL INSPECTION | ||||
STR 16-10-19
| REQ | DESCRIPTION | REQUEST DATE | RESULT | RESULT DATE | INSPECTOR |
|---|---|---|---|---|---|
| 220 | ROUGH IN ELECTRICAL | 16-MAY-12 | 90 | 16-MAY-12 | BLD092 |
THIS IS A REINSPECTION.
ALSO SEE FOUNDATION PER ENGINEER'S REPORT SUBMITTED 4/9/12 JKJ. |
|||||
| 220 | ROUGH IN ELECTRICAL | 21-MAR-12 | 91 | 21-MAR-12 | BLD092 |
IN PROGRESS. |
|||||
| 600 | SEMI-PERMANENT POWER | 16-MAY-12 | 90 | 16-MAY-12 | BLD092 |
SOCCOR FIELD LIGHTING |
|||||
| 999 | FINAL INSPECTION | ||||
STR 16-10-19
| REQ | DESCRIPTION | REQUEST DATE | RESULT | RESULT DATE | INSPECTOR |
|---|---|---|---|---|---|
| 100 | TEMPORARY POWER POLE | 04-APR-12 | 90 | 04-APR-12 | BLD092 |
| 200 | ROUGH IN PLUMBING/FULL | 04-APR-12 | 90 | 04-APR-12 | BLD092 |
| 250 | STRUCTURAL SLAB/FULL | 09-APR-12 | 90 | 09-APR-12 | BLD092 |
FL. PEST-GEO-TECH. |
|||||
| 490 | ROOF SHEATHING NAILING | 20-APR-12 | 90 | 20-APR-12 | BLD092 |
NOTES FROM APPLICANT: "PLEASE INCLUDE WALL NAIL OFF INSPECTION WITH THE ROOF SHEATHING INSPECTION. PLEASE CALL ANDREW 538-9668 WITH ANY QUESTIONS." |
|||||
| 405 | STRUCTURAL FRAMING/PARTIAL | 20-APR-12 | 90 | 20-APR-12 | BLD092 |
WALL NAIL OFF. |
|||||
| 400 | STRUCTURAL FRAMING/FULL | 26-APR-12 | 92 | 26-APR-12 | BLD152 |
MAKE SURE TORN PIECE OF UNDERLAYMENT REPAIRED/REPLACED BEFORE INSTALLING SHINGLES - JUDY |
|||||
| 450 | MECHANICAL FRAMING/FULL | 16-MAY-12 | 90 | 16-MAY-12 | BLD092 |
| 460 | ELECTRICAL WALL ROUGH IN | 16-MAY-12 | 90 | 16-MAY-12 | BLD092 |
| 470 | PLUMBING WALL ROUGH IN | 16-MAY-12 | 81 | 16-MAY-12 | BLD092 |
THERE IS NO PRESSURE ON WATER LINES-FILL TUB VOIDS. |
|||||
| 470 | PLUMBING WALL ROUGH IN | ||||
THIS IS A REINSPECTION |
|||||
| 500 | INSULATION/FULL | ||||
| 550 | CEILING CONCEALMENT/FULL | ||||
| 600 | SEMI-PERMANENT POWER | ||||
| 910 | CO ENGINEERS RELEASE | ||||
| 930 | LANDSCAPE RELEASE | ||||
TR 2012020190 |
|||||
| 985 | CHECK JOB PER B.O. | ||||
| 999 | FINAL INSPECTION | ||||
STR 16-10-19
| REQ | DESCRIPTION | REQUEST DATE | RESULT | RESULT DATE | INSPECTOR |
|---|---|---|---|---|---|
| 100 | TEMPORARY POWER POLE | 04-APR-12 | 90 | 04-APR-12 | BLD092 |
| 200 | ROUGH IN PLUMBING/FULL | 04-APR-12 | 90 | 04-APR-12 | BLD092 |
| 250 | STRUCTURAL SLAB/FULL | 09-APR-12 | 90 | 09-APR-12 | BLD092 |
FL. PEST-GEO-TECH. |
|||||
| 490 | ROOF SHEATHING NAILING | 20-APR-12 | 90 | 20-APR-12 | BLD092 |
NOTES FROM APPLICANT: "PLEASE INCLUDE WALL NAIL OFF INSPECTION WITH THE ROOF SHEATHING INSPECTION. PLEASE CALL ANDREW 538-9668 WITH ANY QUESTIONS." |
|||||
| 405 | STRUCTURAL FRAMING/PARTIAL | 20-APR-12 | 90 | 20-APR-12 | BLD092 |
WALL NAIL OFF. |
|||||
| 400 | STRUCTURAL FRAMING/FULL | 26-APR-12 | 92 | 26-APR-12 | BLD152 |
MAKE SURE TORN PIECE OF UNDERLAYMENT REPAIRED/REPLACED BEFORE INSTALLING SHINGLES - JUDY |
|||||
| 450 | MECHANICAL FRAMING/FULL | 16-MAY-12 | 90 | 16-MAY-12 | BLD092 |
| 460 | ELECTRICAL WALL ROUGH IN | 16-MAY-12 | 90 | 16-MAY-12 | BLD092 |
| 470 | PLUMBING WALL ROUGH IN | 16-MAY-12 | 81 | 16-MAY-12 | BLD092 |
THERE IS NO PRESSURE ON WATER LINES-FILL TUB VOIDS. |
|||||
| 470 | PLUMBING WALL ROUGH IN | ||||
THIS IS A REINSPECTION |
|||||
| 500 | INSULATION/FULL | ||||
| 550 | CEILING CONCEALMENT/FULL | ||||
| 600 | SEMI-PERMANENT POWER | ||||
| 910 | CO ENGINEERS RELEASE | ||||
| 930 | LANDSCAPE RELEASE | ||||
TR 2012020190 |
|||||
| 985 | CHECK JOB PER B.O. | ||||
| 999 | FINAL INSPECTION | ||||
STR 16-10-19
| REQ | DESCRIPTION | REQUEST DATE | RESULT | RESULT DATE | INSPECTOR |
|---|---|---|---|---|---|
| 100 | TEMPORARY POWER POLE | 04-APR-12 | 90 | 04-APR-12 | BLD092 |
| 200 | ROUGH IN PLUMBING/FULL | 04-APR-12 | 90 | 04-APR-12 | BLD092 |
| 250 | STRUCTURAL SLAB/FULL | 09-APR-12 | 90 | 09-APR-12 | BLD092 |
FL. PEST-GEO-TECH. |
|||||
| 490 | ROOF SHEATHING NAILING | 20-APR-12 | 90 | 20-APR-12 | BLD092 |
NOTES FROM APPLICANT: "PLEASE INCLUDE WALL NAIL OFF INSPECTION WITH THE ROOF SHEATHING INSPECTION. PLEASE CALL ANDREW 538-9668 WITH ANY QUESTIONS." |
|||||
| 405 | STRUCTURAL FRAMING/PARTIAL | 20-APR-12 | 90 | 20-APR-12 | BLD092 |
WALL NAIL OFF. |
|||||
| 400 | STRUCTURAL FRAMING/FULL | 26-APR-12 | 92 | 26-APR-12 | BLD152 |
MAKE SURE TORN PIECE OF UNDERLAYMENT REPAIRED/REPLACED BEFORE INSTALLING SHINGLES - JUDY |
|||||
| 450 | MECHANICAL FRAMING/FULL | 16-MAY-12 | 90 | 16-MAY-12 | BLD092 |
| 460 | ELECTRICAL WALL ROUGH IN | 16-MAY-12 | 90 | 16-MAY-12 | BLD092 |
| 470 | PLUMBING WALL ROUGH IN | 16-MAY-12 | 81 | 16-MAY-12 | BLD092 |
THERE IS NO PRESSURE ON WATER LINES-FILL TUB VOIDS. |
|||||
| 470 | PLUMBING WALL ROUGH IN | ||||
THIS IS A REINSPECTION |
|||||
| 500 | INSULATION/FULL | ||||
| 550 | CEILING CONCEALMENT/FULL | ||||
| 600 | SEMI-PERMANENT POWER | ||||
| 910 | CO ENGINEERS RELEASE | ||||
| 930 | LANDSCAPE RELEASE | ||||
TR 2012020190 |
|||||
| 985 | CHECK JOB PER B.O. | ||||
| 999 | FINAL INSPECTION | ||||
STR 20-10-19
| REQ | DESCRIPTION | REQUEST DATE | RESULT | RESULT DATE | INSPECTOR |
|---|---|---|---|---|---|
| 999 | FINAL INSPECTION | 16-MAY-12 | |||
-RECEIVED SIGNATURE 3/28/2012
NOTES FROM APPLICANT: "HOMEOWNER NEEDS 3 PM INSPECTION PLEASE CAN'T GET OFF WORK BEFORE 3 AND 30 MIN CALL AHEAD PLEASE. 352-816-2295. THANKS :)" |
|||||
STR 19-10-19
| REQ | DESCRIPTION | REQUEST DATE | RESULT | RESULT DATE | INSPECTOR |
|---|---|---|---|---|---|
| 490 | ROOF SHEATHING NAILING | 08-MAY-12 | 90 | 08-MAY-12 | BLD072 |
| 999 | FINAL INSPECTION | 16-MAY-12 | |||
(AMELIA GARDENS) |
|||||
STR 19-10-19
| REQ | DESCRIPTION | REQUEST DATE | RESULT | RESULT DATE | INSPECTOR |
|---|---|---|---|---|---|
| 490 | ROOF SHEATHING NAILING | 10-MAY-12 | 90 | 10-MAY-12 | BLD072 |
(AMELIA GARDENS) |
|||||
| 999 | FINAL INSPECTION | 16-MAY-12 | |||
STR 16-11-18
| REQ | DESCRIPTION | REQUEST DATE | RESULT | RESULT DATE | INSPECTOR |
|---|---|---|---|---|---|
| 999 | FINAL INSPECTION | 16-MAY-12 | |||
RECEIVED SIGNATURE
NOTES FROM APPLICANT: "CUSTOMER WOULD LIKE TO HAVE AM INSPECTION. PLEASE GIVE 30 MIN NOTICE BEFORE ARRIVAL 495-9876 OR 222-7295" |
|||||
STR 20-10-19
| REQ | DESCRIPTION | REQUEST DATE | RESULT | RESULT DATE | INSPECTOR |
|---|---|---|---|---|---|
| 490 | ROOF SHEATHING NAILING | 16-MAY-12 | |||
| 999 | FINAL INSPECTION |
STR 20-10-19
| REQ | DESCRIPTION | REQUEST DATE | RESULT | RESULT DATE | INSPECTOR |
|---|---|---|---|---|---|
| 490 | ROOF SHEATHING NAILING | 14-MAY-12 | 90 | 14-MAY-12 | BLD072 |
| 999 | FINAL INSPECTION | 16-MAY-12 |
STR 09-11-19
| REQ | DESCRIPTION | REQUEST DATE | RESULT | RESULT DATE | INSPECTOR |
|---|---|---|---|---|---|
| 999 | FINAL INSPECTION | 16-MAY-12 | |||
NOTES FROM APPLICANT: "REQUESTING AN AM FINAL INSPECTION WITH A 30 MIN. CALL AHEAD. THANK YOU, MARK." |
|||||
STR 19-10-19
| REQ | DESCRIPTION | REQUEST DATE | RESULT | RESULT DATE | INSPECTOR |
|---|---|---|---|---|---|
| 490 | ROOF SHEATHING NAILING | 16-MAY-12 | |||
| 999 | FINAL INSPECTION |
STR 20-10-19
| REQ | DESCRIPTION | REQUEST DATE | RESULT | RESULT DATE | INSPECTOR |
|---|---|---|---|---|---|
| 999 | FINAL INSPECTION | 16-MAY-12 | |||
THIS IS A REINSPECTION
REQUEST AN AM |
|||||
| 999 | FINAL INSPECTION | 14-MAY-12 | 81 | 14-MAY-12 | BLD072 |
REQUEST AN AM INSPECTION THANKS NEED LOCKING CAP PROTECT INSULATION |
|||||
STR 32-10-19
| REQ | DESCRIPTION | REQUEST DATE | RESULT | RESULT DATE | INSPECTOR |
|---|---|---|---|---|---|
| 250 | STRUCTURAL SLAB/FULL | 16-MAY-12 | |||
| 490 | ROOF SHEATHING NAILING | ||||
| 400 | STRUCTURAL FRAMING/FULL | ||||
| 430 | SUBCONTRACTOR VERIFICATION REL | ||||
| 450 | MECHANICAL FRAMING/FULL | ||||
| 500 | INSULATION/FULL | ||||
| 550 | CEILING CONCEALMENT/FULL | ||||
| 985 | CHECK JOB PER B.O. | ||||
7 IPF |
|||||
| 999 | FINAL INSPECTION | ||||
STR 20-10-19
| REQ | DESCRIPTION | REQUEST DATE | RESULT | RESULT DATE | INSPECTOR |
|---|---|---|---|---|---|
| 999 | FINAL INSPECTION | 16-MAY-12 | |||
(PRESERVE)
NOTES FROM APPLICANT: "PLEASE CALL HOMEOWNER, CHRIS DOYLE, 30 MIN AHEAD @ 538-5146. HOMEOWNER REQUESTS AM IF POSSIBLE(ALTERNATE # 335-8622). THANKS :)" |
|||||
STR 20-09-19
| REQ | DESCRIPTION | REQUEST DATE | RESULT | RESULT DATE | INSPECTOR |
|---|---|---|---|---|---|
| 155 | FOUNDATION FOOTING/PARTIAL | 28-NOV-11 | 75 | 28-NOV-11 | BLD142 |
VERIFY N.O.C. FILED |
|||||
| 155 | FOUNDATION FOOTING/PARTIAL | 29-NOV-11 | 91 | 29-NOV-11 | BLD092 |
FOUNDATIONS ON S201-F3222(ELEVATOR #3), F12 ON COLUMN LINES E4 AND E5. COLUMN DOWELS ON E4,E5,E6,AND D6.DOWELS ON 10" WALL AT ELEVATOR #3. |
|||||
| 155 | FOUNDATION FOOTING/PARTIAL | 30-NOV-11 | 91 | 30-NOV-11 | BLD092 |
FOUNDATIONS ON S201-F12 ON COLUMN LINES E2 AND E3.F1714 AND F2516.COLUMN DOWELS ON E2,E3,E7,C1,C2,D2 AND D7. |
|||||
| 350 | CONCRETE WALL | 01-DEC-11 | 91 | 01-DEC-11 | BLD142 |
1.FIRST LIFT WALL @ ELEVATOR 3. |
|||||
| 155 | FOUNDATION FOOTING/PARTIAL | 01-DEC-11 | 91 | 01-DEC-11 | BLD142 |
1.F-14 @ LINE D3,4,AND 5. F2414 @ B-1 |
|||||
| 155 | FOUNDATION FOOTING/PARTIAL | 02-DEC-11 | 91 | 02-DEC-11 | BLD142 |
THIS IS A REINSPECTION1.F18 @ C 3,4.
F1512 @A3 , F8 @ A2 |
|||||
| 155 | FOUNDATION FOOTING/PARTIAL | 05-DEC-11 | 91 | 05-DEC-11 | BLD092 |
P7 ON A.71,P6 ON A.72,F16 ON B3 AND B4,F1512 ON A4 AND F18 ON C5. |
|||||
| 350 | CONCRETE WALL | 06-DEC-11 | 91 | 06-DEC-11 | BLD142 |
WIL'S NOTES: |
|||||
| 315 | CONCRETE COLUMN/PARTIAL | 06-DEC-11 | 91 | 06-DEC-11 | BLD142 |
WIL'S NOTES: |
|||||
| 155 | FOUNDATION FOOTING/PARTIAL | 06-DEC-11 | 91 | 06-DEC-11 | BLD142 |
NOTES FROM APPLICANT: "FOUNDATION,COLUMNS AND GRADE BEAM."
WIL'S NOTES: |
|||||
| 155 | FOUNDATION FOOTING/PARTIAL | 07-DEC-11 | 91 | 07-DEC-11 | BLD092 |
1:30 PLEASE X |
|||||
| 315 | CONCRETE COLUMN/PARTIAL | 07-DEC-11 | 90 | 07-DEC-11 | BLD092 |
1:30 PLEASE |
|||||
| 350 | CONCRETE WALL | 08-DEC-11 | 91 | 08-DEC-11 | BLD142 |
1.WALL AT B 1THRU 2.2 |
|||||
| 350 | CONCRETE WALL | 09-DEC-11 | 91 | 09-DEC-11 | BLD092 |
THIS IS A REINSPECTION
NOTES FROM APPLICANT: "INSPECTION REQUESTED FOR 1030AM FOR FOOTINGS, GRADE BEAM AND COLUMNS" |
|||||
| 150 | FOUNDATION FOOTING/FULL | 09-DEC-11 | 91 | 09-DEC-11 | BLD092 |
| 315 | CONCRETE COLUMN/PARTIAL | 12-DEC-11 | 75 | 12-DEC-11 | BLD142 |
| 150 | FOUNDATION FOOTING/FULL | 12-DEC-11 | 75 | 12-DEC-11 | BLD142 |
ALSO WANTS CONCRETE WALL INSPECTION, PLEASE -
SYSTEM DOWN, CAN ONLY SCHEDULE ONE INSPECTION.
PER MIKE 12/9/11 JKJ |
|||||
| 350 | CONCRETE WALL | 12-DEC-11 | 75 | 12-DEC-11 | BLD142 |
THIS IS A REINSPECTION |
|||||
| 350 | CONCRETE WALL | 13-DEC-11 | 91 | 13-DEC-11 | BLD092 |
X |
|||||
| 150 | FOUNDATION FOOTING/FULL | 13-DEC-11 | 91 | 13-DEC-11 | BLD092 |
X |
|||||
| 315 | CONCRETE COLUMN/PARTIAL | 13-DEC-11 | 91 | 13-DEC-11 | BLD092 |
X |
|||||
| 350 | CONCRETE WALL | 14-DEC-11 | 91 | 14-DEC-11 | BLD142 |
THIS IS A REINSPECTION1.
1.FOUNDATIONS |
|||||
| 150 | FOUNDATION FOOTING/FULL | 14-DEC-11 | 91 | 14-DEC-11 | BLD142 |
THIS IS A REINSPECTION X |
|||||
| 315 | CONCRETE COLUMN/PARTIAL | 14-DEC-11 | 91 | 14-DEC-11 | BLD142 |
THIS IS A REINSPECTION X |
|||||
| 150 | FOUNDATION FOOTING/FULL | 16-DEC-11 | 75 | 16-DEC-11 | BLD092 |
THIS IS A REINSPECTION |
|||||
| 350 | CONCRETE WALL | 15-DEC-11 | 75 | 15-DEC-11 | BLD092 |
THIS IS A REINSPECTION |
|||||
| 315 | CONCRETE COLUMN/PARTIAL | 16-DEC-11 | 75 | 16-DEC-11 | BLD092 |
THIS IS A REINSPECTION |
|||||
| 315 | CONCRETE COLUMN/PARTIAL | 15-DEC-11 | 75 | 15-DEC-11 | BLD092 |
| 315 | CONCRETE COLUMN/PARTIAL | 19-DEC-11 | 75 | 19-DEC-11 | BLD142 |
THIS IS A REINSPECTION |
|||||
| 150 | FOUNDATION FOOTING/FULL | 19-DEC-11 | 75 | 19-DEC-11 | BLD142 |
THIS IS A REINSPECTION |
|||||
| 315 | CONCRETE COLUMN/PARTIAL | 20-DEC-11 | 91 | 20-DEC-11 | BLD092 |
E11-D11-C11-B11 IN GRADE BEAMS.GROUND LEVEL. |
|||||
| 350 | CONCRETE WALL | 20-DEC-11 | 91 | 20-DEC-11 | BLD092 |
1ST LIFT ON ELEVATOR #3. GRADE BEAM 0N NORTH SIDE GRADE LEVEL. |
|||||
| 350 | CONCRETE WALL | 22-DEC-11 | 75 | 22-DEC-11 | BLD142 |
REQUEST 7:00 AM INSPECTION.WANT TO POUR AT 8:00AM. |
|||||
| 315 | CONCRETE COLUMN/PARTIAL | 28-DEC-11 | 91 | 28-DEC-11 | BLD092 |
THIS IS A REINSPECTION X |
|||||
| 350 | CONCRETE WALL | 27-DEC-11 | 75 | 27-DEC-11 | BLD092 |
THIS IS A REINSPECTION
NOTES FROM APPLICANT: "REQUEST FOR INSPECTION AROUND 1:30PM ON DECEMBER 27TH, 2011" |
|||||
| 350 | CONCRETE WALL | 28-DEC-11 | 91 | 28-DEC-11 | BLD092 |
THIS IS A REINSPECTION X |
|||||
| 350 | CONCRETE WALL | 29-DEC-11 | 75 | 29-DEC-11 | BLD092 |
THIS IS A REINSPECTION |
|||||
| 350 | CONCRETE WALL | 30-DEC-11 | 91 | 30-DEC-11 | BLD092 |
10:00 PLEASE.(ALL WALLS WITHIN BUILDING.FIRST FLOOR.) |
|||||
| 315 | CONCRETE COLUMN/PARTIAL | 30-DEC-11 | 90 | 30-DEC-11 | BLD092 |
THIS IS A REINSPECTION |
|||||
| 315 | CONCRETE COLUMN/PARTIAL | 29-DEC-11 | 75 | 29-DEC-11 | BLD092 |
THIS IS A REINSPECTION |
|||||
| 255 | STRUCTURAL SLAB/PARTIAL | 04-JAN-12 | 91 | 04-JAN-12 | BLD142 |
1.FIRST POUR SECOND FLOOR SLAB. |
|||||
| 255 | STRUCTURAL SLAB/PARTIAL | 05-JAN-12 | 91 | 05-JAN-12 | BLD092 |
X |
|||||
| 350 | CONCRETE WALL | 05-JAN-12 | 91 | 05-JAN-12 | BLD092 |
X |
|||||
| 310 | CONCRETE COLUMNS/FULL | 06-JAN-12 | 90 | 06-JAN-12 | BLD142 |
| 350 | CONCRETE WALL | 06-JAN-12 | 90 | 06-JAN-12 | BLD142 |
THIS IS A REINSPECTION |
|||||
| 315 | CONCRETE COLUMN/PARTIAL | 09-JAN-12 | 90 | 09-JAN-12 | BLD092 |
COLUMN LINE 3-A,B,C,D,E. LINE 4-B. SECOND FLOOR. |
|||||
| 310 | CONCRETE COLUMNS/FULL | 10-JAN-12 | 91 | 10-JAN-12 | BLD142 |
COLUMN LINE 4&5 |
|||||
| 310 | CONCRETE COLUMNS/FULL | 11-JAN-12 | 90 | 12-JAN-12 | BLD092 |
THIS IS A REINSPECTION |
|||||
| 255 | STRUCTURAL SLAB/PARTIAL | 11-JAN-12 | 90 | 12-JAN-12 | BLD092 |
| 310 | CONCRETE COLUMNS/FULL | 12-JAN-12 | 90 | 12-JAN-12 | BLD142 |
| 315 | CONCRETE COLUMN/PARTIAL | 13-JAN-12 | 90 | 13-JAN-12 | BLD092 |
COLUMNS ON LINE 7-B,C,E AND 8-A,B,C. |
|||||
| 350 | CONCRETE WALL | 13-JAN-12 | 90 | 13-JAN-12 | BLD092 |
ELEVATOR #3 2ND LIFT. |
|||||
| 310 | CONCRETE COLUMNS/FULL | 17-JAN-12 | 90 | 17-JAN-12 | BLD142 |
| 250 | STRUCTURAL SLAB/FULL | 18-JAN-12 | 75 | 18-JAN-12 | BLD092 |
| 250 | STRUCTURAL SLAB/FULL | 19-JAN-12 | 75 | 19-JAN-12 | BLD142 |
THIS IS A REINSPECTION |
|||||
| 315 | CONCRETE COLUMN/PARTIAL | 19-JAN-12 | 75 | 19-JAN-12 | BLD142 |
THIS IS A REINSPECTION |
|||||
| 350 | CONCRETE WALL | 19-JAN-12 | 75 | 19-JAN-12 | BLD142 |
THIS IS A REINSPECTION |
|||||
| 315 | CONCRETE COLUMN/PARTIAL | 18-JAN-12 | 75 | 18-JAN-12 | BLD092 |
| 350 | CONCRETE WALL | 18-JAN-12 | 75 | 18-JAN-12 | BLD092 |
| 250 | STRUCTURAL SLAB/FULL | 20-JAN-12 | 90 | 20-JAN-12 | BLD092 |
THIRD FLOOR NORTH TO FIVE FEET PAST COL. LINE 5. |
|||||
| 350 | CONCRETE WALL | 20-JAN-12 | 75 | 19-JAN-12 | BLD142 |
THIS IS A REINSPECTION |
|||||
| 315 | CONCRETE COLUMN/PARTIAL | 08-DEC-11 | 91 | 08-DEC-11 | BLD142 |
THIS IS A REINSPECTION
E 2,3,4,5 A 4,5 |
|||||
| 315 | CONCRETE COLUMN/PARTIAL | 23-JAN-12 | 90 | 23-JAN-12 | BLD142 |
THIS IS A REINSPECTION
1.STEEL FOR COLUMNS C-1 A2 C2 D2 E2
A.7-2.2 THIRD FLOOR |
|||||
| 315 | CONCRETE COLUMN/PARTIAL | 24-JAN-12 | 91 | 24-JAN-12 | BLD092 |
X |
|||||
| 315 | CONCRETE COLUMN/PARTIAL | 25-JAN-12 | 90 | 25-JAN-12 | BLD142 |
THIS IS A REINSPECTION |
|||||
| 255 | STRUCTURAL SLAB/PARTIAL | 26-JAN-12 | 91 | 26-JAN-12 | BLD092 |
PARTIAL ON BOTTOM REBAR NORTH HALF OD 3RD FLOOR. |
|||||
| 315 | CONCRETE COLUMN/PARTIAL | 26-JAN-12 | 91 | 26-JAN-12 | BLD092 |
3RD FLOOR. |
|||||
| 255 | STRUCTURAL SLAB/PARTIAL | 27-JAN-12 | 90 | 27-JAN-12 | BLD142 |
THIS IS A REINSPECTION |
|||||
| 315 | CONCRETE COLUMN/PARTIAL | 27-JAN-12 | 90 | 27-JAN-12 | BLD142 |
THIS IS A REINSPECTION |
|||||
| 315 | CONCRETE COLUMN/PARTIAL | 30-JAN-12 | 81 | 30-JAN-12 | BLD092 |
NO READY. |
|||||
| 315 | CONCRETE COLUMN/PARTIAL | 31-JAN-12 | 90 | 31-JAN-12 | BLD142 |
THIS IS A REINSPECTION |
|||||
| 315 | CONCRETE COLUMN/PARTIAL | 01-FEB-12 | 91 | 01-FEB-12 | BLD092 |
3 RD FLOOR COLUMNS A ON LINE 6,B,C AND ON LINE 7,CAND D ON LINE 8. |
|||||
| 350 | CONCRETE WALL | 01-FEB-12 | 91 | 01-FEB-12 | BLD092 |
ELEVATOR 3 WALLS.3RD DECK. |
|||||
| 315 | CONCRETE COLUMN/PARTIAL | 02-FEB-12 | 91 | 02-FEB-12 | BLD142 |
10:00 OR 10:30 AM. |
|||||
| 350 | CONCRETE WALL | 03-FEB-12 | 91 | 03-FEB-12 | BLD092 |
STAIR WALLS ON #3,3RD LEVEL. |
|||||
| 315 | CONCRETE COLUMN/PARTIAL | 03-FEB-12 | 90 | 03-FEB-12 | BLD092 |
3RD LEVEL COLUMNS A9,B9,B10,C11 AND D11. |
|||||
| 315 | CONCRETE COLUMN/PARTIAL | 06-FEB-12 | 75 | 06-FEB-12 | BLD142 |
THIS IS A REINSPECTION |
|||||
| 350 | CONCRETE WALL | 06-FEB-12 | 90 | 06-FEB-12 | BLD142 |
THIS IS A REINSPECTION |
|||||
| 255 | STRUCTURAL SLAB/PARTIAL | 06-FEB-12 | 90 | 06-FEB-12 | BLD142 |
BOTTOM LAYER, SOUTH HALF OF 3RD LEVEL. |
|||||
| 315 | CONCRETE COLUMN/PARTIAL | 07-FEB-12 | 91 | 07-FEB-12 | BLD092 |
A-10 AND E-11, 3RD LEVEL. |
|||||
| 275 | COMMERCIAL SLAB/PARTIAL | 07-FEB-12 | 75 | 07-FEB-12 | BLD092 |
READY WED. |
|||||
| 275 | COMMERCIAL SLAB/PARTIAL | 08-FEB-12 | 90 | 08-FEB-12 | BLD142 |
THIS IS A REINSPECTION
1.SOUTH HALF FOURTH FLOOR.
2.LEVEL 2 STAIR LANDING EAST. |
|||||
| 315 | CONCRETE COLUMN/PARTIAL | 08-FEB-12 | 90 | 08-FEB-12 | BLD142 |
THIS IS A REINSPECTION |
|||||
| 155 | FOUNDATION FOOTING/PARTIAL | 09-FEB-12 | 81 | 09-FEB-12 | BLD092 |
GRADEBEAM GROUND FLOOR (NOT READY.) |
|||||
| 155 | FOUNDATION FOOTING/PARTIAL | 10-FEB-12 | 90 | 10-FEB-12 | BLD142 |
THIS IS A REINSPECTION
1. GRADE BEAM 1ST.FLOOR NORTHWEST CORNER. |
|||||
| 310 | CONCRETE COLUMNS/FULL | 10-FEB-12 | 91 | 10-FEB-12 | BLD142 |
1.COLUMNS C1,C2,E2,D2,A1 AND WALL 4TH. FLOOR SOUTHWEST CORNER. |
|||||
| 315 | CONCRETE COLUMN/PARTIAL | 13-FEB-12 | 90 | 13-FEB-12 | BLD232 |
-4TH FLOOR COLUMNS, PARTIAL SOUTH END...JCF |
|||||
| 255 | STRUCTURAL SLAB/PARTIAL | 14-FEB-12 | 90 | 14-FEB-12 | BLD142 |
| 310 | CONCRETE COLUMNS/FULL | 14-FEB-12 | 90 | 14-FEB-12 | BLD142 |
THIS IS A REINSPECTION |
|||||
| 315 | CONCRETE COLUMN/PARTIAL | 15-FEB-12 | 91 | 15-FEB-12 | BLD092 |
F5 ON LINE A6. |
|||||
| 315 | CONCRETE COLUMN/PARTIAL | 16-FEB-12 | 90 | 16-FEB-12 | BLD142 |
THIS IS A REINSPECTION
1.COLUMNS A6 B6 C6 D6 E6 |
|||||
| 315 | CONCRETE COLUMN/PARTIAL | 16-FEB-12 | 91 | 16-FEB-12 | BLD142 |
THIS IS A REINSPECTION
1.CAGES ONLY |
|||||
| 350 | CONCRETE WALL | 17-FEB-12 | 90 | 17-FEB-12 | BLD142 |
| 315 | CONCRETE COLUMN/PARTIAL | 17-FEB-12 | 90 | 17-FEB-12 | BLD142 |
| 315 | CONCRETE COLUMN/PARTIAL | 20-FEB-12 | 91 | 20-FEB-12 | BLD092 |
COLUMN IN 1' 3" WALL BY ELEVATOR 2 AND 3 FOURTH FLOOR. |
|||||
| 350 | CONCRETE WALL | 20-FEB-12 | 91 | 20-FEB-12 | BLD092 |
1' 3" WALL BY ELEVATOR 2 AND 3. WALLS ON ELEVATOR 2 AND 3 4TH FLOOR. |
|||||
| 350 | CONCRETE WALL | 21-FEB-12 | 91 | 21-FEB-12 | BLD142 |
1.STAIRWAY WALLS EASTSIDE |
|||||
| 315 | CONCRETE COLUMN/PARTIAL | 21-FEB-12 | 90 | 21-FEB-12 | BLD142 |
1.COLUMNS B8,B9,C9,D9,E9 &A9
2.CHECKED STEEL FOR REMAINING COLUMNS. |
|||||
| 315 | CONCRETE COLUMN/PARTIAL | 22-FEB-12 | 91 | 22-FEB-12 | BLD092 |
4 TH LEVEL COLUMNS 10B-11B-11C-11D AND 11 E. |
|||||
| 315 | CONCRETE COLUMN/PARTIAL | 23-FEB-12 | 90 | 23-FEB-12 | BLD142 |
THIS IS A REINSPECTION |
|||||
| 270 | COMMERCIAL SLAB/FULL | 23-FEB-12 | 91 | 23-FEB-12 | BLD142 |
SOUTH END ROOF DECK |
|||||
| 270 | COMMERCIAL SLAB/FULL | 01-MAR-12 | 91 | 01-MAR-12 | BLD142 |
THIS IS A REINSPECTION
X |
|||||
| 270 | COMMERCIAL SLAB/FULL | 02-MAR-12 | 90 | 02-MAR-12 | BLD142 |
THIS IS A REINSPECTION |
|||||
| 350 | CONCRETE WALL | 06-MAR-12 | 90 | 06-MAR-12 | BLD092 |
KNEE WALL ON ROOF AROUND EQUIPMENT PADS. |
|||||
| 275 | COMMERCIAL SLAB/PARTIAL | 06-MAR-12 | 90 | 06-MAR-12 | BLD092 |
EQUIPMENT PADS ON ROOF. |
|||||
| 350 | CONCRETE WALL | 07-MAR-12 | 90 | 07-MAR-12 | BLD142 |
| 255 | STRUCTURAL SLAB/PARTIAL | 21-MAR-12 | 90 | 21-MAR-12 | BLD142 |
THIS IS A REINSPECTION
NOTES FROM APPLICANT: "S.O.G INSPECTION NEEDED FROM COLUMN LINE 1 TO COLUMN LINE 5.5. PLEASE SCHEDULE FOR AFTER LUNCH TIME. ANY QUESTIONS CALL 352-266-0317-PAUL" |
|||||
| 250 | STRUCTURAL SLAB/FULL | 04-APR-12 | 90 | 04-APR-12 | BLD152 |
NOTES FROM APPLICANT: "PLEASE SCHEDULE SOG INSPECTION FOR 1-B ON WEDNESDAY, APRIL 4TH AROUND 11 A.M. ALSO WILL & MIKE ARE INVITED TO TOP OUT LUNCHEON AT 12P.M. ON SAME DAY." |
|||||
| 405 | STRUCTURAL FRAMING/PARTIAL | 20-APR-12 | 90 | 20-APR-12 | BLD142 |
NOTES FROM APPLICANT: "FRAMING INSPECTION C/L "A" AT WEST CURTAIN WALL LOCATION. REQUEST A.M. INSPECTION?" |
|||||
| 405 | STRUCTURAL FRAMING/PARTIAL | 26-APR-12 | 91 | 26-APR-12 | BLD142 |
NOTES FROM APPLICANT: "COLD-FORMED EXTERIOR METAL FRAMING ALONG C/L A FROM C/L 2.2 TO 6 FOR CURTAIN WALL. 2ND & 4TH FLOOR" |
|||||
| 405 | STRUCTURAL FRAMING/PARTIAL | 07-MAY-12 | 92 | 07-MAY-12 | BLD152 |
THIS IS A REINSPECTION
NOTES FROM APPLICANT: "COLD FORM FRAMING INSPECTION WEST ELEVATION COLUMN LINE A 1ST FLOOR THRU 4TH FLOOR"
TIE-IN TO CEILING WILL BE DONE AS CEILING FRAMING COMPLETES ON INDIVIDUAL FLOORS - JUDY |
|||||
| 405 | STRUCTURAL FRAMING/PARTIAL | 10-MAY-12 | 90 | 10-MAY-12 | BLD152 |
NOTES FROM APPLICANT: "SCREW OFF INSPECTION FOR DENS GLASS WEST ELEVATION ALONG COLUMN LINE A. REQUEST PM INSEPCTION."
DENSGLASS SCREWS @ 8" & 10" OC; COL LINE 1 TO 6.8, WEST SIDE - JUDY |
|||||
| 400 | STRUCTURAL FRAMING/FULL | 14-MAY-12 | 91 | 14-MAY-12 | BLD092 |
NOTES FROM APPLICANT: "DENS GLASS SCREW INSPECTION WEST SIDE FROM COLUMN LINE 8 TO 11. 1ST FLOOR THRU ROOF." |
|||||
| 430 | SUBCONTRACTOR VERIFICATION REL | 11-MAY-12 | 90 | 11-MAY-12 | BLD152 |
(2011120134 - ELEC; MC DEAN INC)
(2012020008 - FIRE SPRINKLER (UG MAIN ONLY) - WW GAY)
(2012020026 - MECH; CCS MECHANICAL)
(2012020062 - FIRE SPRINKLER; COX FIRE)
(2012030018 - PLBG; QUALITY PLUMBING) |
|||||
| 400 | STRUCTURAL FRAMING/FULL | 16-MAY-12 | 91 | 16-MAY-12 | BLD152 |
THIS IS A REINSPECTION
NOTES FROM APPLICANT: "TWO INSPECTION REQUESTS; 1-COLD FORM FRAMING INSPECTION OF PENTHOUSE WALLS. 2- ROOF EDGE OF SLAB FIRE PROOFING. A.M. IF POSSIBLE"
AREAS INSPECTED AS PER CONTRACTORS REQUEST - JUDY |
|||||
| 400 | STRUCTURAL FRAMING/FULL | ||||
THIS IS A REINSPECTION |
|||||
| 320 | POURED CELLS/FULL | ||||
| 305 | LINTEL-TIE BEAM/PARTIAL | ||||
| 300 | LINTEL-TIE BEAM/FULL | ||||
| 490 | ROOF SHEATHING NAILING | ||||
| 505 | INSULATION/PARTIAL | ||||
| 500 | INSULATION/FULL | ||||
| 480 | FIRE/PARTY WALL | ||||
| 555 | CEILING CONCEALMENT/PARTIAL | ||||
| 550 | CEILING CONCEALMENT/FULL | ||||
| 910 | CO ENGINEERS RELEASE | ||||
| 920 | FIRE MARSHAL RELEASE | ||||
| 930 | LANDSCAPE RELEASE | ||||
| 985 | CHECK JOB PER B.O. | ||||
| 999 | FINAL INSPECTION | ||||
STR 04-10-19
| REQ | DESCRIPTION | REQUEST DATE | RESULT | RESULT DATE | INSPECTOR |
|---|---|---|---|---|---|
| 400 | STRUCTURAL FRAMING/FULL | 03-MAY-12 | 90 | 03-MAY-12 | BLD072 |
WINDOWS |
|||||
| 800 | CHANGE OF SERVICE | 09-MAY-12 | 92 | 09-MAY-12 | BLD092 |
OK TO RELEASE POWER TO UNITS 705, 706, 707 ONLY |
|||||
| 800 | CHANGE OF SERVICE | 16-MAY-12 | 90 | 16-MAY-12 | BLD092 |
| 920 | FIRE MARSHAL RELEASE | 09-MAY-12 | 90 | 09-MAY-12 | FIR012 |
| 950 | TEMPORARY C O | 10-MAY-12 | 90 | 10-MAY-12 | BLD092 |
NOTES FROM APPLICANT: "FOR MIKE NIXON"
NOTES FROM APPLICANT: "FINAL FOR 701,705 ON THIS PERMIT ONLY FINAL ON 1501AND 1502[2011100166]" |
|||||
| 999 | FINAL INSPECTION | ||||
THIS IS A REINSPECTION |
|||||
| 999 | FINAL INSPECTION | 10-MAY-12 | 75 | 10-MAY-12 | WEBUSER |
NOTES FROM APPLICANT: "NEED FINAL ON 701, 705 AND 1501, 1502[2011100166]" |
|||||
STR 03-10-18
| REQ | DESCRIPTION | REQUEST DATE | RESULT | RESULT DATE | INSPECTOR |
|---|---|---|---|---|---|
| 150 | FOUNDATION FOOTING/FULL | 27-MAR-12 | 81 | 27-MAR-12 | BLD152 |
NEED LETTER/DETAIL FROM ENGINEER GILL RE: CALL FOR 4' CLEAN FILL UNDER ALL FOOTINGS, VERTICAL DOWELS CUT TOO SHORT TO TIE INTO SLAB ( AS PER PLAN), AND THE COLD JOINTS THAT WILL BE FORMED BY ALL STOOPS AND PORCHES, IF POURED AS PLANNED. |
|||||
| 150 | FOUNDATION FOOTING/FULL | 29-MAR-12 | 90 | 03-APR-12 | BLD092 |
THIS IS A REINSPECTION |
|||||
| 150 | FOUNDATION FOOTING/FULL | 26-MAR-12 | 75 | 23-MAR-12 | WEBUSER |
| 155 | FOUNDATION FOOTING/PARTIAL | 08-MAY-12 | 81 | 08-MAY-12 | BLD092 |
FOOTER INSPECTION FOR FRONT PORCH - REQUESTED BY CONTRACTOR (STRUCT. PLANS ARE NOT IN DOC. BOX.) |
|||||
| 200 | ROUGH IN PLUMBING/FULL | 18-APR-12 | 90 | 18-APR-12 | BLD152 |
NOTES FROM APPLICANT: "WOULD LIKE TO SCHEDULE SLAB ROUGH-IN PLUMBING INSPECTION FOR WEDNESDAY, 04/18/12." |
|||||
| 270 | COMMERCIAL SLAB/FULL | 25-APR-12 | 92 | 25-APR-12 | BLD152 |
SLEEVE WATER LINES THRU LD-BRNG FOOTER; NEED LETTER ON LARGE GROUP OF ELEC CONDUITS PASSING THRU SAME FOOTER. JUDY |
|||||
| 155 | FOUNDATION FOOTING/PARTIAL | 16-MAY-12 | 90 | 16-MAY-12 | BLD092 |
THIS IS A REINSPECTION |
|||||
| 155 | FOUNDATION FOOTING/PARTIAL | 16-MAY-12 | 75 | 15-MAY-12 | WEBUSER |
THIS IS A REINSPECTION |
|||||
| 380 | WALL TIE AND FLASHING | ||||
| 490 | ROOF SHEATHING NAILING | ||||
| 400 | STRUCTURAL FRAMING/FULL | ||||
| 450 | MECHANICAL FRAMING/FULL | ||||
| 500 | INSULATION/FULL | ||||
| 480 | FIRE/PARTY WALL | ||||
| 550 | CEILING CONCEALMENT/FULL | ||||
| 600 | SEMI-PERMANENT POWER | ||||
| 910 | CO ENGINEERS RELEASE | ||||
| 930 | LANDSCAPE RELEASE | ||||
| 935 | ARCHITECTURAL REVIEW RELEASE | ||||
| 920 | FIRE MARSHAL RELEASE | ||||
| 985 | CHECK JOB PER B.O. | ||||
| 999 | FINAL INSPECTION | ||||
STR 03-10-18
| REQ | DESCRIPTION | REQUEST DATE | RESULT | RESULT DATE | INSPECTOR |
|---|---|---|---|---|---|
| 150 | FOUNDATION FOOTING/FULL | 27-MAR-12 | 81 | 27-MAR-12 | BLD152 |
NEED LETTER/DETAIL FROM ENGINEER GILL RE: CALL FOR 4' CLEAN FILL UNDER ALL FOOTINGS, VERTICAL DOWELS CUT TOO SHORT TO TIE INTO SLAB ( AS PER PLAN), AND THE COLD JOINTS THAT WILL BE FORMED BY ALL STOOPS AND PORCHES, IF POURED AS PLANNED. |
|||||
| 150 | FOUNDATION FOOTING/FULL | 29-MAR-12 | 90 | 03-APR-12 | BLD092 |
THIS IS A REINSPECTION |
|||||
| 150 | FOUNDATION FOOTING/FULL | 26-MAR-12 | 75 | 23-MAR-12 | WEBUSER |
| 155 | FOUNDATION FOOTING/PARTIAL | 08-MAY-12 | 81 | 08-MAY-12 | BLD092 |
FOOTER INSPECTION FOR FRONT PORCH - REQUESTED BY CONTRACTOR (STRUCT. PLANS ARE NOT IN DOC. BOX.) |
|||||
| 200 | ROUGH IN PLUMBING/FULL | 18-APR-12 | 90 | 18-APR-12 | BLD152 |
NOTES FROM APPLICANT: "WOULD LIKE TO SCHEDULE SLAB ROUGH-IN PLUMBING INSPECTION FOR WEDNESDAY, 04/18/12." |
|||||
| 270 | COMMERCIAL SLAB/FULL | 25-APR-12 | 92 | 25-APR-12 | BLD152 |
SLEEVE WATER LINES THRU LD-BRNG FOOTER; NEED LETTER ON LARGE GROUP OF ELEC CONDUITS PASSING THRU SAME FOOTER. JUDY |
|||||
| 155 | FOUNDATION FOOTING/PARTIAL | 16-MAY-12 | 90 | 16-MAY-12 | BLD092 |
THIS IS A REINSPECTION |
|||||
| 155 | FOUNDATION FOOTING/PARTIAL | 16-MAY-12 | 75 | 15-MAY-12 | WEBUSER |
THIS IS A REINSPECTION |
|||||
| 380 | WALL TIE AND FLASHING | ||||
| 490 | ROOF SHEATHING NAILING | ||||
| 400 | STRUCTURAL FRAMING/FULL | ||||
| 450 | MECHANICAL FRAMING/FULL | ||||
| 500 | INSULATION/FULL | ||||
| 480 | FIRE/PARTY WALL | ||||
| 550 | CEILING CONCEALMENT/FULL | ||||
| 600 | SEMI-PERMANENT POWER | ||||
| 910 | CO ENGINEERS RELEASE | ||||
| 930 | LANDSCAPE RELEASE | ||||
| 935 | ARCHITECTURAL REVIEW RELEASE | ||||
| 920 | FIRE MARSHAL RELEASE | ||||
| 985 | CHECK JOB PER B.O. | ||||
| 999 | FINAL INSPECTION | ||||
STR 04-10-19
| REQ | DESCRIPTION | REQUEST DATE | RESULT | RESULT DATE | INSPECTOR |
|---|---|---|---|---|---|
| 200 | ROUGH IN PLUMBING/FULL | 16-MAY-12 | 90 | 16-MAY-12 | BLD092 |
THIS IS A REINSPECTION
SUBMITTED AS-BUILT 5/15/12 JKJ |
|||||
| 200 | ROUGH IN PLUMBING/FULL | 26-APR-12 | 81 | 26-APR-12 | BLD152 |
BATHROOM (TO REMAIN) NOT TIED INTO DRAIL LINE; PROVIDE PLUMBING RISER |
|||||
| 250 | STRUCTURAL SLAB/FULL | ||||
| 430 | SUBCONTRACTOR VERIFICATION REL | ||||
| 450 | MECHANICAL FRAMING/FULL | ||||
| 920 | FIRE MARSHAL RELEASE | ||||
| 985 | CHECK JOB PER B.O. | ||||
| 999 | FINAL INSPECTION | ||||
STR 21-09-19
| REQ | DESCRIPTION | REQUEST DATE | RESULT | RESULT DATE | INSPECTOR |
|---|---|---|---|---|---|
| 150 | FOUNDATION FOOTING/FULL | 22-MAR-12 | 81 | 22-MAR-12 | BLD142 |
| 150 | FOUNDATION FOOTING/FULL | 23-MAR-12 | 90 | 23-MAR-12 | BLD142 |
THIS IS A REINSPECTION |
|||||
| 300 | LINTEL-TIE BEAM/FULL | 03-APR-12 | 90 | 03-APR-12 | BLD142 |
THIS IS A REINSPECTION
REQUEST AN AM INSPECTION ALSO WANTS THE POURED CELL INSPECITON |
|||||
| 300 | LINTEL-TIE BEAM/FULL | 02-APR-12 | 81 | 02-APR-12 | BLD142 |
SEE CELLS |
|||||
| 320 | POURED CELLS/FULL | 02-APR-12 | 81 | 02-APR-12 | BLD142 |
1.NEED CORRECT LAP ON HOOK BARS. |
|||||
| 320 | POURED CELLS/FULL | 03-APR-12 | 90 | 23-APR-12 | BLD142 |
THIS IS A REINSPECTION |
|||||
| 230 | ROUGH IN CRAWL SPACE | 16-APR-12 | 92 | 16-APR-12 | BLD142 |
1.LEAVE OPENING IN FLOOR TO CHECK PLUMBING. |
|||||
| 490 | ROOF SHEATHING NAILING | 23-APR-12 | 92 | 23-APR-12 | BLD142 |
NEED ENGINEERING FOR 8D RING SHANKS -
REC'V'D LETTER FROM FREEMAN DESIGN GROUP - 8D RING SHANK 6"/12" OK - 4/25/12 JKJ. |
|||||
| 400 | STRUCTURAL FRAMING/FULL | 23-APR-12 | 91 | 23-APR-12 | BLD142 |
WALLS ONLY |
|||||
| 155 | FOUNDATION FOOTING/PARTIAL | 24-APR-12 | 90 | 24-APR-12 | BLD142 |
FOR ADENDA SUBMITTED 4/13/12 |
|||||
| 305 | LINTEL-TIE BEAM/PARTIAL | 27-APR-12 | 90 | 27-APR-12 | BLD142 |
FOR ADENDA SUBMITTED 4/13/12 |
|||||
| 400 | STRUCTURAL FRAMING/FULL | 14-MAY-12 | 92 | 14-MAY-12 | BLD152 |
THIS IS A REINSPECTION
NOTES FROM APPLICANT: "IM TRYING TO CALL IN PLUMBING ROUGH #200 AS WELL AS #400 STRUCTURAL"
INSTALLING METAL ROOF, TRUSSES OK. OK TO FINISH SUBFLOOR - LEFT OPEN FOR PLUMBING ROUGH. PLUMBING COMPLETE, WITH VTR. WILL ENTER ON INSPECTION LIST ONCE SUBCONTRACTOR FORM SUBMITTED. |
|||||
| 400 | STRUCTURAL FRAMING/FULL | 14-MAY-12 | 75 | 13-MAY-12 | WEBUSER |
THIS IS A REINSPECTION |
|||||
| 400 | STRUCTURAL FRAMING/FULL | 11-MAY-12 | 74 | 11-MAY-12 | BLD152 |
THIS IS A REINSPECTION |
|||||
| 400 | STRUCTURAL FRAMING/FULL | 07-MAY-12 | 91 | 07-MAY-12 | BLD152 |
THIS IS A REINSPECTION ROOF SHEATHING AND WALL NAILING ON EAST ADDITION (LAUNDRY ROOM) - FLOOR JOISTS ATTACHED AS PER ENG. JUDY |
|||||
| 400 | STRUCTURAL FRAMING/FULL | 04-MAY-12 | 74 | 04-MAY-12 | BLD092 |
THIS IS A REINSPECTION |
|||||
| 430 | SUBCONTRACTOR VERIFICATION REL | 15-MAY-12 | 92 | 15-MAY-12 | CDM162 |
RECEIVED SUB SHEET
ELECTRICAL CLARK ELECTRIC CERT # 11047
MECHANICAL BOUNDS CERT # 8094
PLUMBING PREFERRED PLUMBING CERT # 8411
ROOFING MAC JOHNSON ROOFING CERT # 9677
GAS LPG MECHANICAL CERT # 9286 |
|||||
| 200 | ROUGH IN PLUMBING/FULL | 16-MAY-12 | 90 | 16-MAY-12 | BLD152 |
SEE NOTES ON PREVIOUS INSPECTION |
|||||
| 450 | MECHANICAL FRAMING/FULL | ||||
| 500 | INSULATION/FULL | ||||
| 550 | CEILING CONCEALMENT/FULL | ||||
| 985 | CHECK JOB PER B.O. | ||||
10 IPF |
|||||
| 999 | FINAL INSPECTION | ||||
STR 31-09-19
| REQ | DESCRIPTION | REQUEST DATE | RESULT | RESULT DATE | INSPECTOR |
|---|---|---|---|---|---|
| 999 | FINAL INSPECTION | 16-MAY-12 | 99 | 16-MAY-12 | BLD092 |
NOTES FROM APPLICANT: "HOMEOWNER NEEDS PM & CALL AHEAD 352-281-4035 PLEASE WON'T BE AVAILABLE AM. THANKS :)" |
|||||
STR 14-09-18
| REQ | DESCRIPTION | REQUEST DATE | RESULT | RESULT DATE | INSPECTOR |
|---|---|---|---|---|---|
| 250 | STRUCTURAL SLAB/FULL | 11-APR-12 | 90 | 11-APR-12 | BLD142 |
| 300 | LINTEL-TIE BEAM/FULL | 25-APR-12 | 81 | 25-APR-12 | BLD142 |
X |
|||||
| 325 | POURED CELLS/PARTIAL | 26-APR-12 | 81 | 26-APR-12 | BLD142 |
THIS IS A REINSPECTION
1.REBAR MISSING IN CELLS. |
|||||
| 300 | LINTEL-TIE BEAM/FULL | 01-MAY-12 | 91 | 01-MAY-12 | BLD152 |
@ 8' AFF |
|||||
| 320 | POURED CELLS/FULL | 01-MAY-12 | 91 | 02-MAY-12 | BLD152 |
THIS IS A REINSPECTION
TO 8' W/CLEANOUTS |
|||||
| 320 | POURED CELLS/FULL | 04-MAY-12 | 82 | 04-MAY-12 | BLD092 |
PLANS ARE NOT IN DOC BOX, UNABLE TO DO INSPECTION. |
|||||
| 320 | POURED CELLS/FULL | 09-MAY-12 | 90 | 09-MAY-12 | BLD152 |
THIS IS A REINSPECTION |
|||||
| 300 | LINTEL-TIE BEAM/FULL | 09-MAY-12 | 90 | 09-MAY-12 | BLD152 |
THIS IS A REINSPECTION |
|||||
| 490 | ROOF SHEATHING NAILING | 14-MAY-12 | 90 | 14-MAY-12 | BLD152 |
ALSO READY FOR STRUCTURAL FRAMING |
|||||
| 400 | STRUCTURAL FRAMING/FULL | 14-MAY-12 | 91 | 14-MAY-12 | BLD152 |
WALL NAILING ONLY. |
|||||
| 400 | STRUCTURAL FRAMING/FULL | ||||
THIS IS A REINSPECTION |
|||||
| 430 | SUBCONTRACTOR VERIFICATION REL | 16-MAY-12 | 92 | 16-MAY-12 | CDM162 |
RECEIVED SUB SHEET ENTERED
ELECTRIC THREE PHASE ELECTRIC
PLUMBING N FLORIDA PLUMBING INC |
|||||
| 460 | ELECTRICAL WALL ROUGH IN | ||||
| 985 | CHECK JOB PER B.O. | ||||
| 999 | FINAL INSPECTION | ||||
STR 28-09-19
| REQ | DESCRIPTION | REQUEST DATE | RESULT | RESULT DATE | INSPECTOR |
|---|---|---|---|---|---|
| 490 | ROOF SHEATHING NAILING | 24-APR-12 | 92 | 24-APR-12 | BLD152 |
WORK IN PROGRESS |
|||||
| 999 | FINAL INSPECTION | 09-MAY-12 | 91 | 09-MAY-12 | BLD152 |
NEED REROOF AFFIDAVIT |
|||||
| 999 | FINAL INSPECTION | 14-MAY-12 | 81 | 14-MAY-12 | BLD092 |
NO AFFIDAVIT IN PACKAGE,FAX OR BRING IT TO OFFICE THE OK TO FINAL. |
|||||
| 999 | FINAL INSPECTION | 16-MAY-12 | 99 | 16-MAY-12 | BLD092 |
THIS IS A REINSPECTION |
|||||
STR 33-09-19
| REQ | DESCRIPTION | REQUEST DATE | RESULT | RESULT DATE | INSPECTOR |
|---|---|---|---|---|---|
| 999 | FINAL INSPECTION | 16-MAY-12 | 99 | 16-MAY-12 | BLD092 |
NOTES FROM APPLICANT: "A.M. REQUEST PLEASE. TENNANT PHONE #314-503-5079" |
|||||
STR 31-09-19
| REQ | DESCRIPTION | REQUEST DATE | RESULT | RESULT DATE | INSPECTOR |
|---|---|---|---|---|---|
| 999 | FINAL INSPECTION | 16-MAY-12 | 99 | 16-MAY-12 | BLD092 |
NOTES FROM APPLICANT: "HOMEOWNER WILL BE HOME UNTIL 1PM WOULD LIKE INSPECTION BEFORE THEN.NO PROMISES MADE BUT IF YOU CAN'T GET THERE BEFORE HE HAS TO LEAVE PLEASE PLEASE GIVE ME A CALL SO WE CAN RESCHEDULE. THANKS VERY VERY MUCH...TANGIE(352-377-4414)" |
|||||
STR 31-09-19
| REQ | DESCRIPTION | REQUEST DATE | RESULT | RESULT DATE | INSPECTOR |
|---|---|---|---|---|---|
| 430 | SUBCONTRACTOR VERIFICATION REL | 15-MAY-12 | 92 | 15-MAY-12 | CDM162 |
RECEIVED SUB SHEET
ELECTRIC BILLEY SANTERFIET ELECTRIC
HVAC BOUNDS
PLUMBING CHURCHS
ROOFING DUFFIELD
GAS GORDON GAS PIPING & REPAIRS INC
LOW VOLTAGE BILLY SANTERFIET ELECTRIC |
|||||
| 100 | TEMPORARY POWER POLE | 10-MAY-12 | 90 | 10-MAY-12 | BLD092 |
NOTES FROM APPLICANT: "I MAY ALSO BE READY FOR A PLUMBING INSP. ALSO IF YOU COME IN P M THANKS ." |
|||||
| 200 | ROUGH IN PLUMBING/FULL | 10-MAY-12 | 90 | 10-MAY-12 | BLD092 |
| 250 | STRUCTURAL SLAB/FULL | 15-MAY-12 | 90 | 15-MAY-12 | BLD092 |
| 490 | ROOF SHEATHING NAILING | ||||
THIS IS A REINSPECTION |
|||||
| 490 | ROOF SHEATHING NAILING | 16-MAY-12 | 75 | 16-MAY-12 | BLD092 |
NOTES FROM APPLICANT: "I MAY ALSO BE READY FOR A PLUMBING INSP. ALSO IF YOU COME IN P M THANKS ." |
|||||
| 400 | STRUCTURAL FRAMING/FULL | ||||
| 450 | MECHANICAL FRAMING/FULL | ||||
| 500 | INSULATION/FULL | ||||
| 550 | CEILING CONCEALMENT/FULL | ||||
| 600 | SEMI-PERMANENT POWER | ||||
| 985 | CHECK JOB PER B.O. | ||||
| 999 | FINAL INSPECTION | ||||
STR 31-09-19
| REQ | DESCRIPTION | REQUEST DATE | RESULT | RESULT DATE | INSPECTOR |
|---|---|---|---|---|---|
| 150 | FOUNDATION FOOTING/FULL | 16-MAY-12 | 90 | 16-MAY-12 | BLD092 |
| 999 | FINAL INSPECTION |
STR 05-10-19
| REQ | DESCRIPTION | REQUEST DATE | RESULT | RESULT DATE | INSPECTOR |
|---|---|---|---|---|---|
| 700 | POOL BOND/STEEL | 08-MAY-12 | 90 | 08-MAY-12 | BLD092 |
ELECTRIC PERMIT #2012040389
PERMIT LOCATED IN WHITE BOX AT THE SOUTH END OF POOL |
|||||
| 750 | POOL DECK | 17-MAY-12 | |||
THIS IS A REINSPECTION |
|||||
| 750 | POOL DECK | 16-MAY-12 | 81 | 16-MAY-12 | BLD092 |
PAVERS ON DOWN ON HALF OF THE DECK, CAN'T DO INSPECTION, ITS COVERED UP. |
|||||
| 999 | FINAL INSPECTION | ||||
STR 02-10-18
| REQ | DESCRIPTION | REQUEST DATE | RESULT | RESULT DATE | INSPECTOR |
|---|---|---|---|---|---|
| 999 | FINAL INSPECTION | 16-MAY-12 | 99 | 16-MAY-12 | BLD152 |
STR 08-09-18
| REQ | DESCRIPTION | REQUEST DATE | RESULT | RESULT DATE | INSPECTOR |
|---|---|---|---|---|---|
| 490 | ROOF SHEATHING NAILING | 08-MAY-12 | 92 | 08-MAY-12 | BLD152 |
WORK IN PROGRESS |
|||||
| 999 | FINAL INSPECTION | 16-MAY-12 | 99 | 16-MAY-12 | BLD152 |
STR 22-9-19
| REQ | DESCRIPTION | REQUEST DATE | RESULT | RESULT DATE | INSPECTOR |
|---|---|---|---|---|---|
| 999 | FINAL INSPECTION | ||||
THIS IS A REINSPECTION |
|||||
| 999 | FINAL INSPECTION | 16-MAY-12 | 91 | 16-MAY-12 | BLD152 |
RECEIVED SIGNATURE
NOTES FROM APPLICANT: "AFTER 12PM PLEASE, AND CALL ON WAY SO THAT WE CAN MEET INSP, 472-2761-THANKS."
NEED DUCT SEAL AFFIDAVIT FAXED TO BLDG DEPT |
|||||
STR 27-09-18
| REQ | DESCRIPTION | REQUEST DATE | RESULT | RESULT DATE | INSPECTOR |
|---|---|---|---|---|---|
| 100 | TEMPORARY POWER POLE | 14-MAY-12 | 90 | 14-MAY-12 | BLD092 |
NOTES FROM APPLICANT: "T POLE AND PLUMBING PLEASE, PLIERS ON SITE TO REMOVE GAUGE IF NEEDED" |
|||||
| 200 | ROUGH IN PLUMBING/FULL | 14-MAY-12 | 90 | 14-MAY-12 | BLD092 |
| 250 | STRUCTURAL SLAB/FULL | 17-MAY-12 | |||
THIS IS A REINSPECTION |
|||||
| 250 | STRUCTURAL SLAB/FULL | 16-MAY-12 | 82 | 16-MAY-12 | BLD152 |
NOTES FROM APPLICANT: "THANKS BARRY" |
|||||
| 490 | ROOF SHEATHING NAILING | ||||
| 400 | STRUCTURAL FRAMING/FULL | ||||
| 430 | SUBCONTRACTOR VERIFICATION REL | 16-MAY-12 | 92 | 16-MAY-12 | CDM162 |
RECEIVED SUB SHEET ENTERED
ELECTRICAL MCKINNEY ELECTRIC COMPANY
HVAC ALL ELEMENTS MECHANICAL CORP
PLUMIBNG 4-H PLUMBING
ROOFING MAC JOHNSON ROOFING
GAS THAMES |
|||||
| 450 | MECHANICAL FRAMING/FULL | ||||
| 500 | INSULATION/FULL | ||||
| 550 | CEILING CONCEALMENT/FULL | ||||
| 600 | SEMI-PERMANENT POWER | ||||
| 910 | CO ENGINEERS RELEASE | ||||
| 985 | CHECK JOB PER B.O. | ||||
| 999 | FINAL INSPECTION | ||||
STR 27-09-18
| REQ | DESCRIPTION | REQUEST DATE | RESULT | RESULT DATE | INSPECTOR |
|---|---|---|---|---|---|
| 100 | TEMPORARY POWER POLE | 14-MAY-12 | 90 | 14-MAY-12 | BLD092 |
NOTES FROM APPLICANT: "T POLE AND PLUMBING PLEASE, PLIERS ON SITE TO REMOVE GAUGE IF NEEDED" |
|||||
| 200 | ROUGH IN PLUMBING/FULL | 14-MAY-12 | 90 | 14-MAY-12 | BLD092 |
| 250 | STRUCTURAL SLAB/FULL | 17-MAY-12 | |||
THIS IS A REINSPECTION |
|||||
| 250 | STRUCTURAL SLAB/FULL | 16-MAY-12 | 82 | 16-MAY-12 | BLD152 |
NOTES FROM APPLICANT: "THANKS BARRY" |
|||||
| 490 | ROOF SHEATHING NAILING | ||||
| 400 | STRUCTURAL FRAMING/FULL | ||||
| 430 | SUBCONTRACTOR VERIFICATION REL | 16-MAY-12 | 92 | 16-MAY-12 | CDM162 |
RECEIVED SUB SHEET ENTERED
ELECTRICAL MCKINNEY ELECTRIC COMPANY
HVAC ALL ELEMENTS MECHANICAL CORP
PLUMIBNG 4-H PLUMBING
ROOFING MAC JOHNSON ROOFING
GAS THAMES |
|||||
| 450 | MECHANICAL FRAMING/FULL | ||||
| 500 | INSULATION/FULL | ||||
| 550 | CEILING CONCEALMENT/FULL | ||||
| 600 | SEMI-PERMANENT POWER | ||||
| 910 | CO ENGINEERS RELEASE | ||||
| 985 | CHECK JOB PER B.O. | ||||
| 999 | FINAL INSPECTION | ||||
STR 27-09-18
| REQ | DESCRIPTION | REQUEST DATE | RESULT | RESULT DATE | INSPECTOR |
|---|---|---|---|---|---|
| 100 | TEMPORARY POWER POLE | 11-MAY-12 | 90 | 11-MAY-12 | BLD152 |
NOTES FROM APPLICANT: "PLEASE INSPECT UNDERGROUND PLUMBING AND TEMP POLE.
THANKS" |
|||||
| 200 | ROUGH IN PLUMBING/FULL | 11-MAY-12 | 81 | 11-MAY-12 | BLD152 |
DID NOT HAVE TOOL TO REMOVE GAUGE TO ENSURE WATER ON LINES - JUDY |
|||||
| 200 | ROUGH IN PLUMBING/FULL | 14-MAY-12 | 90 | 14-MAY-12 | BLD092 |
THIS IS A REINSPECTION
NOTES FROM APPLICANT: "PLIARS ON SITE TO REMOVE GAUGE IF NEEDED--THANKS BARRY" |
|||||
| 250 | STRUCTURAL SLAB/FULL | 17-MAY-12 | |||
THIS IS A REINSPECTION |
|||||
| 250 | STRUCTURAL SLAB/FULL | 16-MAY-12 | 81 | 16-MAY-12 | BLD142 |
NOTES FROM APPLICANT: "THANKS BARRY" |
|||||
| 490 | ROOF SHEATHING NAILING | ||||
| 400 | STRUCTURAL FRAMING/FULL | ||||
| 430 | SUBCONTRACTOR VERIFICATION REL | 16-MAY-12 | 92 | 16-MAY-12 | CDM162 |
RECEIVED SUB SHEET ENTERED
ELECTRICAL MCKINNEY ELECTRIC COMPANY
HVAC ALL ELEMENTS MECHANICAL CORP
PLUMIBNG 4-H PLUMBING
ROOFING MAC JOHNSON ROOFING
GAS THAMES |
|||||
| 450 | MECHANICAL FRAMING/FULL | ||||
| 500 | INSULATION/FULL | ||||
| 550 | CEILING CONCEALMENT/FULL | ||||
| 600 | SEMI-PERMANENT POWER | ||||
| 910 | CO ENGINEERS RELEASE | ||||
| 985 | CHECK JOB PER B.O. | ||||
| 999 | FINAL INSPECTION | ||||
STR 27-09-18
| REQ | DESCRIPTION | REQUEST DATE | RESULT | RESULT DATE | INSPECTOR |
|---|---|---|---|---|---|
| 100 | TEMPORARY POWER POLE | 11-MAY-12 | 90 | 11-MAY-12 | BLD152 |
NOTES FROM APPLICANT: "PLEASE INSPECT UNDERGROUND PLUMBING AND TEMP POLE.
THANKS" |
|||||
| 200 | ROUGH IN PLUMBING/FULL | 11-MAY-12 | 81 | 11-MAY-12 | BLD152 |
DID NOT HAVE TOOL TO REMOVE GAUGE TO ENSURE WATER ON LINES - JUDY |
|||||
| 200 | ROUGH IN PLUMBING/FULL | 14-MAY-12 | 90 | 14-MAY-12 | BLD092 |
THIS IS A REINSPECTION
NOTES FROM APPLICANT: "PLIARS ON SITE TO REMOVE GAUGE IF NEEDED--THANKS BARRY" |
|||||
| 250 | STRUCTURAL SLAB/FULL | 17-MAY-12 | |||
THIS IS A REINSPECTION |
|||||
| 250 | STRUCTURAL SLAB/FULL | 16-MAY-12 | 81 | 16-MAY-12 | BLD142 |
NOTES FROM APPLICANT: "THANKS BARRY" |
|||||
| 490 | ROOF SHEATHING NAILING | ||||
| 400 | STRUCTURAL FRAMING/FULL | ||||
| 430 | SUBCONTRACTOR VERIFICATION REL | 16-MAY-12 | 92 | 16-MAY-12 | CDM162 |
RECEIVED SUB SHEET ENTERED
ELECTRICAL MCKINNEY ELECTRIC COMPANY
HVAC ALL ELEMENTS MECHANICAL CORP
PLUMIBNG 4-H PLUMBING
ROOFING MAC JOHNSON ROOFING
GAS THAMES |
|||||
| 450 | MECHANICAL FRAMING/FULL | ||||
| 500 | INSULATION/FULL | ||||
| 550 | CEILING CONCEALMENT/FULL | ||||
| 600 | SEMI-PERMANENT POWER | ||||
| 910 | CO ENGINEERS RELEASE | ||||
| 985 | CHECK JOB PER B.O. | ||||
| 999 | FINAL INSPECTION | ||||
STR 14-09-18
| REQ | DESCRIPTION | REQUEST DATE | RESULT | RESULT DATE | INSPECTOR |
|---|---|---|---|---|---|
| 993 | WELL SERVICE FINAL | 15-MAY-12 | 81 | 15-MAY-12 | BLD152 |
| 993 | WELL SERVICE FINAL | 16-MAY-12 | 99 | 16-MAY-12 | BLD152 |
THIS IS A REINSPECTION
REQUEST AFTERNOON THANKS |
|||||
STR 18-07-18
| REQ | DESCRIPTION | REQUEST DATE | RESULT | RESULT DATE | INSPECTOR |
|---|---|---|---|---|---|
| 700 | POOL BOND/STEEL | 01-JUN-11 | 90 | 01-JUN-11 | BLD152 |
| 750 | POOL DECK | 01-JUN-11 | 92 | 01-JUN-11 | BLD152 |
8 X 8 FOOTERS INSTALLED; BOND RING INSTALLED FOR DECK - FIBERGLASS POOL SHELL |
|||||
| 985 | CHECK JOB PER B.O. | 16-MAY-12 | 92 | 16-MAY-12 | PLX042 |
NEEDS SEPARATE ELECTRIC PERMIT
NOTES FROM APPLICANT: "FEE WAS PAID FOR AN EXTENSION FOR POOL PERMIT AND ELECTRIC PERMIT AS PER JOHN COPELAND. WOULD LIKE BOTH FINALS INSPECTED
THANKS" |
|||||
| 999 | FINAL INSPECTION | 16-MAY-12 | 81 | 16-MAY-12 | BLD152 |
INSTALL SCREEN ENCLOSURE/BABY BARRIER/FENCE AROUND POOL IN ORDER TO COMPLY WITH 2007 FBC (RESIDENTIAL) R4101.17.1. JUDY |
|||||
| 999 | FINAL INSPECTION | ||||
THIS IS A REINSPECTION |
|||||
STR 18-07-18
| REQ | DESCRIPTION | REQUEST DATE | RESULT | RESULT DATE | INSPECTOR |
|---|---|---|---|---|---|
| 700 | POOL BOND/STEEL | 01-JUN-11 | 90 | 01-JUN-11 | BLD152 |
| 750 | POOL DECK | 01-JUN-11 | 92 | 01-JUN-11 | BLD152 |
8 X 8 FOOTERS INSTALLED; BOND RING INSTALLED FOR DECK - FIBERGLASS POOL SHELL |
|||||
| 985 | CHECK JOB PER B.O. | 16-MAY-12 | 92 | 16-MAY-12 | PLX042 |
NEEDS SEPARATE ELECTRIC PERMIT
NOTES FROM APPLICANT: "FEE WAS PAID FOR AN EXTENSION FOR POOL PERMIT AND ELECTRIC PERMIT AS PER JOHN COPELAND. WOULD LIKE BOTH FINALS INSPECTED
THANKS" |
|||||
| 999 | FINAL INSPECTION | 16-MAY-12 | 81 | 16-MAY-12 | BLD152 |
INSTALL SCREEN ENCLOSURE/BABY BARRIER/FENCE AROUND POOL IN ORDER TO COMPLY WITH 2007 FBC (RESIDENTIAL) R4101.17.1. JUDY |
|||||
| 999 | FINAL INSPECTION | ||||
THIS IS A REINSPECTION |
|||||
STR 18-07-18
| REQ | DESCRIPTION | REQUEST DATE | RESULT | RESULT DATE | INSPECTOR |
|---|---|---|---|---|---|
| 999 | FINAL INSPECTION | ||||
THIS IS A REINSPECTION |
|||||
| 999 | FINAL INSPECTION | 16-MAY-12 | 91 | 16-MAY-12 | BLD152 |
LABEL POOL PANEL |
|||||
STR 01-08-18
| REQ | DESCRIPTION | REQUEST DATE | RESULT | RESULT DATE | INSPECTOR |
|---|---|---|---|---|---|
| 200 | ROUGH IN PLUMBING/FULL | 13-DEC-11 | 90 | 13-DEC-11 | BLD092 |
REQUEST AN EARLY INSPECTION HAS DR APPT AT 1:00 THANK YOU |
|||||
| 320 | POURED CELLS/FULL | 02-APR-12 | 90 | 02-APR-12 | BLD142 |
***AM INSPECTION PLEASE...REQUESTED BY OWNER |
|||||
| 400 | STRUCTURAL FRAMING/FULL | 16-MAY-12 | 90 | 16-MAY-12 | BLD152 |
WANTS THE MECHANICAL INSPECTION |
|||||
| 450 | MECHANICAL FRAMING/FULL | ||||
| 500 | INSULATION/FULL | ||||
| 550 | CEILING CONCEALMENT/FULL | ||||
| 985 | CHECK JOB PER B.O. | ||||
| 999 | FINAL INSPECTION | ||||
STR 24-08-17
| REQ | DESCRIPTION | REQUEST DATE | RESULT | RESULT DATE | INSPECTOR |
|---|---|---|---|---|---|
| 150 | FOUNDATION FOOTING/FULL | 01-MAR-12 | 90 | 01-MAR-12 | BLD092 |
FOUNDATION IN UNDISTURBED SOIL. |
|||||
| 150 | FOUNDATION FOOTING/FULL | 29-FEB-12 | 81 | 29-FEB-12 | BLD092 |
TRANSVERSE BARS ARE NOT INSTALLED. |
|||||
| 200 | ROUGH IN PLUMBING/FULL | 08-MAR-12 | 90 | 08-MAR-12 | BLD142 |
| 250 | STRUCTURAL SLAB/FULL | 12-MAR-12 | 90 | 12-MAR-12 | BLD092 |
| 320 | POURED CELLS/FULL | 21-MAR-12 | 81 | 21-MAR-12 | BLD142 |
X |
|||||
| 300 | LINTEL-TIE BEAM/FULL | 21-MAR-12 | 81 | 21-MAR-12 | BLD142 |
1.NEEDS HORIZONTAL JOINT REINFORCEMEMT.
2.NEED DETAIL FOR GARAGE DOOR HEADERS. |
|||||
| 300 | LINTEL-TIE BEAM/FULL | 23-MAR-12 | 90 | 23-MAR-12 | BLD152 |
THIS IS A REINSPECTION.
REC'V'D ARCHITECT'S ADDENDA 3/22/12 - REV'W'D BY JUDY |
|||||
| 320 | POURED CELLS/FULL | 23-MAR-12 | 90 | 23-MAR-12 | BLD142 |
THIS IS A REINSPECTION |
|||||
| 490 | ROOF SHEATHING NAILING | 10-APR-12 | 90 | 10-APR-12 | BLD142 |
ALSO WALL SHEATHING |
|||||
| 400 | STRUCTURAL FRAMING/FULL | 13-APR-12 | 75 | 13-APR-12 | BLD152 |
WALL SHEATHING |
|||||
| 400 | STRUCTURAL FRAMING/FULL | 03-MAY-12 | 91 | 03-MAY-12 | BLD152 |
THIS IS A REINSPECTION
ANCHOR FRAME WALL ABOVE ENTRY TO BOND BEAM; NEED DOUBLE STUDS UNDER DBL GIRDERS; CUT OPENING AT RIDGE TO ENSURE GOOD ATTIC VENTILATION; SUBMIT TRUSS REPAIR FOR F2A TO BLDG DEPT; UPSTAIRS WALL UNDER R1 THRU R10 IS LOAD-BEARING - MISSING DOUBLE TOP PLATE, MISSING TIE DOWNS FOR THOSE 3-PT BEARING TRUSSES; PROVIDE CONTINUOUS TIE THRU TO FOUNDATION; ADD LAT BRACING TO TRUSS R13A (OVER ENTRY). CHECK FOR SEPARATION BETWEEN WALL OVER ENTRY AND CONCRETE. |
|||||
| 400 | STRUCTURAL FRAMING/FULL | 17-APR-12 | 91 | 17-APR-12 | BLD142 |
THIS IS A REINSPECTION
1.EXTERIOR WALLS ONLY. |
|||||
| 400 | STRUCTURAL FRAMING/FULL | 07-MAY-12 | 90 | 07-MAY-12 | BLD152 |
THIS IS A REINSPECTION
REC'V'D TRUSS REPAIR 5/7/12 JKJ |
|||||
| 400 | STRUCTURAL FRAMING/FULL | 04-MAY-12 | 74 | 04-MAY-12 | BLD092 |
THIS IS A REINSPECTION
REQUEST MECHANICAL ALSO |
|||||
| 450 | MECHANICAL FRAMING/FULL | 07-MAY-12 | 92 | 07-MAY-12 | BLD152 |
ADD ENG TO TRUSS R13A ABOVE ENTRY; NEED DETAIL FOR ACHIEVING CONTINUOUS TIE FOR INT LD-BRNG WALL 2ND FLOOR; CAULK ALL HOLES/GAPS IN 2ND FLOOR; AND FINISH DRAIN LINE AND WATER PIPING TO MASTER BATHROOM GROUP. |
|||||
| 500 | INSULATION/FULL | 16-MAY-12 | 92 | 16-MAY-12 | BLD152 |
REC'V'D YANSKEY ADDENDA RE: CONTINUOUS LOAD PATH (SEE NOTES 5/3/12 INSPECTION) - 5/15/12 JKJ
INSULATE WATER LINES ABOVE CEILING IN MASTER BATH; PROVIDE CERT ON BLOWN AT FINAL. |
|||||
| 550 | CEILING CONCEALMENT/FULL | ||||
| 600 | SEMI-PERMANENT POWER | ||||
| 900 | HEALTH DEPARTMENT RELEASE | ||||
| 985 | CHECK JOB PER B.O. | ||||
15 IPF |
|||||
| 999 | FINAL INSPECTION | ||||