Construction Cost Calculator

To calculate construction costs, choose a construction group and construction code.
Heated Sq Ft
Construction Group
Construction Code
Non-Heated Sq Ft
Construction Group
Construction Code

  1. Private Garages use Utility, miscellaneous
  2. For shell only buildings deduct 20 percent
  3. N.P. = not permitted
  4. Unfinished basements (Group R-3) = $21.00 per sq. ft.

GroupIAIBIIAIIBIIIAIIIBIVVAVB
A-1 Assembly, theaters, with stage 263.06 254.15 247.55 237.53 223.05 216.60 229.90 207.42 199.94
A-1 Assembly, theaters, without stage 241.02 232.11 225.51 215.49 201.01 194.56 207.86 185.38 177.89
A-2 Assembly, nightclubs 205.93 199.80 194.89 186.91 176.19 171.34 180.27 159.46 154.02
A-2 Assembly, restaurants, bars, banquet halls 204.93 198.80 192.89 185.91 174.19 170.34 179.27 157.46 153.02
A-3 Assembly, churches 243.83 234.92 228.32 218.30 204.21 198.79 210.67 188.58 181.10
A-3 Assembly, general, community halls, libraries, museums 204.02 195.11 187.51 178.49 163.01 157.56 170.86 147.38 140.89
A-4 Assembly, arenas 240.02 231.11 223.51 214.49 199.01 193.56 206.86 183.38 176.89
B Business 212.46 204.72 197.90 188.18 171.81 165.32 180.77 151.15 144.35
E Educational 222.69 214.99 208.81 199.81 186.17 176.74 192.93 162.78 157.80
F-1 Factory and industrial, moderate hazard 125.58 119.68 112.86 108.68 97.37 92.83 104.02 80.23 75.34
F-2 Factory and industrial, low hazard 124.58 118.68 112.86 107.68 97.37 91.83 103.02 80.23 74.34
H-1 High Hazard, explosives 117.37 111.47 105.65 100.47 90.40 84.87 95.81 73.27 N.P.
H234 High Hazard 117.37 111.47 105.65 100.47 90.40 84.87 95.81 73.27 67.37
H-5 HPM 212.46 204.72 197.90 188.18 171.81 165.32 180.77 151.15 144.35
I-1 Institutional, supervised environment 211.58 204.34 198.27 190.28 175.02 170.20 190.53 156.95 152.25
I-2 Institutional, hospitals 355.95 348.21 341.39 331.67 314.48 N.P. 324.26 293.82 N.P.
I-2 Institutional, nursing homes 247.27 239.53 232.71 222.99 207.36 N.P. 215.58 186.70 N.P.
I-3 Institutional, restrained 241.59 233.85 227.03 217.31 202.46 194.97 209.90 181.80 173.00
I-4 Institutional, day care facilities 211.58 204.34 198.27 190.28 175.02 170.20 190.53 156.95 152.25
M Mercantile 153.55 147.41 141.50 134.53 123.48 119.63 127.88 106.75 102.31
R-1 Residential, hotels 213.59 206.35 200.28 192.29 176.78 171.95 192.54 158.70 154.00
R-2 Residential, multiple family 179.04 171.80 165.73 157.74 143.25 138.43 157.99 125.18 120.47
R-3 Residential, one- and two-family 166.68 162.17 157.99 154.10 149.61 144.19 151.48 138.79 130.58
R-4 Residential, care/assisted living facilities 211.58 204.34 198.27 190.28 175.02 170.20 190.53 156.95 152.25
S-1 Storage, moderate hazard 116.37 110.47 103.65 99.47 88.40 83.87 94.81 71.27 66.37
S-2 Storage, low hazard 115.37 109.47 103.65 98.47 88.40 82.87 93.81 71.27 65.37
U Utility, miscellaneous 89.90 84.75 79.27 75.71 67.97 63.50 72.24 53.83 51.28