Today's Inspections

: Thursday, Mar 21, 2019 ~ Inspections Summary Report ~ 102 Inspections


# Insp. # Permit # Type RequestDate ResultDate Result Zone Address Subdivision STR Description Assigned Inspector
1 770014 2018080224 BR 03/21/19 1 15708 SE 20 AVE 07-10-22 POURED CELLS/FULL THOMAS MCCARTHY
2 770179 2018080641 BR 03/21/19 1 17030 NE 120 AVE 30-08-22 STRUCTURAL FRAMING/PARTIAL THOMAS MCCARTHY
3 754922 2018100382 RM 03/21/19 1 4308 E UNIVERSITY AVE LAKE FOREST FARMS 01-10-20 FINAL INSPECTION THOMAS MCCARTHY
4 763076 2018120375 RC 03/21/19 1 120 W UNIVERSITY AVE 05-10-20 ROUGH IN PLUMBING/FULL DAVID MEYER
5 766859 2019010538 BR 03/21/19 1 7880 SE 200 DR 32-10-22 STRUCTURAL SLAB/FULL THOMAS MCCARTHY
6 770219 2019010538 BR 03/21/19 1 7880 SE 200 DR 32-10-22 ELECTRICAL BONDING & GROUNDING/FULL THOMAS MCCARTHY
7 768439 2019030143 RN 03/21/19 1 3005 SW WILLISTON RD CLINCH GRANT, D L 00-10-19 IN PROGRESS THOMAS MCCARTHY
8 770061 2019030373 RN 03/21/19 1 3011 SW WILLISTON RD 00-10-19 FINAL INSPECTION THOMAS MCCARTHY
9 726090 2017120146 BR 03/21/19 2 6481 SW 74 DR BRYTAN PHASE 1 28-10-19 SEMI-PERMANENT POWER THOMAS MCCARTHY
10 740533 2018050005 BR 03/21/19 2 3284 SW 117 TER OAKMONT PH 2 13-10-18 BLOWER DOOR RELEASE N/A
11 745985 2018060442 BR 03/21/19 2 3581 SW 106 ST ESTATES OF WILDS PLANTATION 18-10-19 FINAL INSPECTION GREG FERRONE
12 756808 2018100277 BR 03/21/19 2 11836 SW 33 LN OAKMONT PH 2 13-10-18 CEILING ATTACHMENT (FULL) GREG FERRONE
13 770220 2018100277 BR 03/21/19 2 11836 SW 33 LN OAKMONT PH 2 13-10-18 WALL ATTACHMENT (FULL) GREG FERRONE
14 759542 2018110076 BR 03/21/19 03/20/19 90 2 8380 SW 58 PL CHESNUT VILLAGE PHASE I 29-10-19 SUBCONTRACTOR VERIFICATION REL N/A
15 759678 2018110152 BR 03/21/19 2 11268 SW 36 RD OAKMONT PH 2 13-10-18 SEWER CONNECTION GREG FERRONE
16 770222 2018110480 BR 03/21/19 03/21/19 90 2 10575 SW 96 LN MEADOWS ON THE PRAIRIE 06-11-19 HOUSEWRAP DAVID G. AMES
17 770223 2018110480 BR 03/21/19 03/21/19 90 2 10575 SW 96 LN MEADOWS ON THE PRAIRIE 06-11-19 WINDOW ATTACHMENT DAVID G. AMES
18 770224 2018110480 BR 03/21/19 03/21/19 81 2 10575 SW 96 LN MEADOWS ON THE PRAIRIE 06-11-19 DOOR ATTACHMENT DAVID G. AMES
19 770221 2018110480 BR 03/21/19 03/21/19 90 2 10575 SW 96 LN MEADOWS ON THE PRAIRIE 06-11-19 ROOF FLASHING/UNDERLAYMENT DAVID G. AMES
20 761699 2018110480 BR 03/21/19 03/21/19 92 2 10575 SW 96 LN MEADOWS ON THE PRAIRIE 06-11-19 STRUCTURAL FRAMING/FULL DAVID G. AMES
21 770227 2018110480 BR 03/21/19 03/21/19 90 2 10575 SW 96 LN MEADOWS ON THE PRAIRIE 06-11-19 INTERIOR FRAMING DAVID G. AMES
22 770226 2018110480 BR 03/21/19 03/21/19 90 2 10575 SW 96 LN MEADOWS ON THE PRAIRIE 06-11-19 STRUCTURAL TIE-DOWN DAVID G. AMES
23 770225 2018110480 BR 03/21/19 03/21/19 90 2 10575 SW 96 LN MEADOWS ON THE PRAIRIE 06-11-19 SHEAR WALL DAVID G. AMES
24 769564 2018120085 AR 03/21/19 2 5204 SW 77 TER VALWOOD 20-10-19 TEMPORARY POWER POLE DAVID G. AMES
25 762029 2018120222 BR 03/21/19 2 9295 SW 67 LN LUGANO PH 2 30-10-19 SHEATHING-FULL THOMAS MCCARTHY
26 762042 2018120222 BR 03/21/19 03/21/19 75 2 9295 SW 67 LN LUGANO PH 2 30-10-19 FINISHED FLOOR ELEVATION VERIFICATION CANCELLED BY APPLICANT
27 770229 2018120280 BR 03/21/19 2 6785 SW LUGANO CT LUGANO PH 2 30-10-19 WALL ATTACHMENT (FULL) THOMAS MCCARTHY
28 762470 2018120280 BR 03/21/19 2 6785 SW LUGANO CT LUGANO PH 2 30-10-19 CEILING ATTACHMENT (FULL) THOMAS MCCARTHY
29 760877 2018120340 MB 03/21/19 2 7117 SW ARCHER RD #2316 ARREDONDO VILLAGE A/K/A ARREDONDO FARMS 28-10-19 MOBILE HOME FINAL THOMAS MCCARTHY
30 760874 2018120345 MB 03/21/19 2 7117 SW ARCHER RD #2232 ARREDONDO VILLAGE A/K/A ARREDONDO FARMS 28-10-19 MOBILE HOME FINAL THOMAS MCCARTHY
31 762730 2018120367 BR 03/21/19 2 9322 SW 65 PL LUGANO PH 1 30-10-19 ELECTRICAL WALL ROUGH IN (FULL) THOMAS MCCARTHY
32 762731 2018120367 BR 03/21/19 2 9322 SW 65 PL LUGANO PH 1 30-10-19 GAS WALL ROUGH IN THOMAS MCCARTHY
33 762732 2018120367 BR 03/21/19 2 9322 SW 65 PL LUGANO PH 1 30-10-19 PLUMBING WALL ROUGH IN (FULL) THOMAS MCCARTHY
34 762729 2018120367 BR 03/21/19 2 9322 SW 65 PL LUGANO PH 1 30-10-19 MECHANICAL WALL ROUGH IN/FULL THOMAS MCCARTHY
35 770230 2018120367 BR 03/21/19 2 9322 SW 65 PL LUGANO PH 1 30-10-19 ELECTRICAL BONDING & GROUNDING/FULL THOMAS MCCARTHY
36 762211 2018120388 RM 03/21/19 2 520 SW 69 ST CEDAR RIDGE ADDN 04-10-19 FINAL INSPECTION DAVID G. AMES
37 762226 2018120389 RM 03/21/19 2 520 SW 69 ST CEDAR RIDGE ADDN 04-10-19 FINAL INSPECTION DAVID G. AMES
38 763700 2018120390 RM 03/21/19 2 520 SW 69 ST CEDAR RIDGE ADDN 04-10-19 CEILING ATTACHMENT (FULL) DAVID G. AMES
39 762238 2018120390 RM 03/21/19 2 520 SW 69 ST CEDAR RIDGE ADDN 04-10-19 SEMI-PERMANENT POWER DAVID G. AMES
40 762743 2019010075 SP 03/21/19 2 13116 SW CR 346 23-11-18 FINAL INSPECTION DAVID G. AMES
41 762343 2019010175 EL 03/21/19 2 7117 SW ARCHER RD #2232 ARREDONDO VILLAGE A/K/A ARREDONDO FARMS 28-10-19 REPAIR OF SERVICE FINAL THOMAS MCCARTHY
42 762350 2019010178 EL 03/21/19 2 7117 SW ARCHER RD #2316 ARREDONDO VILLAGE A/K/A ARREDONDO FARMS 28-10-19 REPAIR OF SERVICE FINAL THOMAS MCCARTHY
43 765373 2019010284 BR 03/21/19 2 9288 SW 67 LN LUGANO PH 2 30-10-19 SHEATHING-FULL THOMAS MCCARTHY
44 765387 2019010284 BR 03/21/19 03/21/19 75 2 9288 SW 67 LN LUGANO PH 2 30-10-19 FINISHED FLOOR ELEVATION VERIFICATION CANCELLED BY APPLICANT
45 763909 2019010509 PI 03/21/19 2 9272 SW 29 AVE HAILE PLANTATION UNIT 36 PHASE IV(STOREY'S ROUND) 18-10-19 POOL BOND/STEEL DAVID G. AMES
46 770232 2019010509 PI 03/21/19 2 9272 SW 29 AVE HAILE PLANTATION UNIT 36 PHASE IV(STOREY'S ROUND) 18-10-19 ROUGH IN PLUMBING/FULL DAVID G. AMES
47 765255 2019010603 AL 03/21/19 2 10469 SW 27 PL ESTATES OF WILDS PLANTATION 18-10-19 FINAL INSPECTION GREG FERRONE
48 769230 2019020305 AL 03/21/19 2 7725 SW 87 TER WILLOW OAK PLANTATION 32-10-19 STRUCTURAL SLAB/FULL DAVID G. AMES
49 766495 2019020307 RM 03/21/19 2 9319 SW 61 AVE 30-10-19 FOUNDATION FOOTING/PARTIAL DAVID G. AMES
50 766987 2019020464 RR 03/21/19 2 8158 SW 51 BLVD STILLWIND CLUSTER S/D PHASE I 20-10-19 FINAL INSPECTION DAVID G. AMES
51 767897 2019020476 RM 03/21/19 2 8410 SW 52 PL HAILE PLANTATION 1 (LAUREL PARK) 20-10-19 FINAL INSPECTION DAVID G. AMES
52 768005 2019030056 RR 03/21/19 2 10907 SW 24 AVE NAMORA ESTATES 13-10-18 FINAL INSPECTION GREG FERRONE
53 768052 2019030071 PL 03/21/19 2 5223 SW 75 TER VALWOOD 20-10-19 FINAL INSPECTION DAVID G. AMES
54 769085 2019030238 RR 03/21/19 2 3529 SW 84 ST KENWOOD UNIT 3 17-10-19 FINAL INSPECTION DAVID G. AMES
55 769980 2019030348 RR 03/21/19 2 9321 SW 33 RD HAILE PLANTATION 34 PH 2 (MILLS GLEN) 18-10-19 IN PROGRESS DAVID G. AMES
56 762372 2017040036 RC 03/21/19 3 2563 NW 97 DR 23 WEST 30-09-19 WIRE LATH DAVID MEYER
57 770070 2017040038 RC 03/21/19 3 9684 NW 24 LN 23 WEST 30-09-19 SEMI-PERMANENT POWER GREG FERRONE
58 769892 2017040044 BM 03/21/19 3 9747 NW 25 LN 23 WEST 30-09-19 STRUCTURAL FRAMING/PARTIAL DAVID MEYER
59 711293 2017040051 BM 03/21/19 3 2548 NW 96 DR 23 WEST 30-09-19 SEMI-PERMANENT POWER GREG FERRONE
60 769236 2018080576 BR 03/21/19 3 1333 NW 58 TER PARK AVENUE 34-09-19 SHEAR WALL GREG FERRONE
61 769235 2018080576 BR 03/21/19 3 1333 NW 58 TER PARK AVENUE 34-09-19 STRUCTURAL FRAMING/FULL GREG FERRONE
62 769218 2018080576 BR 03/21/19 3 1333 NW 58 TER PARK AVENUE 34-09-19 ROOF FLASHING/UNDERLAYMENT GREG FERRONE
63 753602 2018090272 BM 03/21/19 3 12941 NW 11 PL WEST END UNITB PHASE2 35-9-18 FINAL INSPECTION DAVID MEYER
64 753561 2018090273 BM 03/21/19 03/21/19 90 3 12909 NW 11 PL WEST END UNITB PHASE2 35-9-18 BLOWER DOOR RELEASE GEORGE GILLESPIE
65 753618 2018090274 BM 03/21/19 03/21/19 90 3 12917 NW 11 PL WEST END UNITB PHASE2 35-9-18 BLOWER DOOR RELEASE GEORGE GILLESPIE
66 769061 2018090417 BR 03/21/19 3 11411 NEWBERRY RD 01-10-18 PLUMBING WALL ROUGH IN (FULL) DAVID MEYER
67 754030 2018090417 BR 03/21/19 3 11411 NEWBERRY RD 01-10-18 INSULATION/FULL DAVID MEYER
68 770027 2018100274 BR 03/21/19 3 1187 NW 136 ST ARBOR GREENS PH II, UNIT II 35-09-18 SEMI-PERMANENT POWER DAVID MEYER
69 756605 2018100274 BR 03/21/19 3 1187 NW 136 ST ARBOR GREENS PH II, UNIT II 35-09-18 BACKER BOARD DAVID MEYER
70 768602 2018100630 BR 03/21/19 3 556 SW 125 TER AMARIAH PARK 2-10-18 WIRE LATH DAVID MEYER
71 758425 2018110083 BC 03/21/19 3 6900 W NEWBERRY RD 33-09-19 PLUMBING WALL ROUGH IN (PARTIAL) DAVID MEYER
72 766620 2018110121 BR 03/21/19 3 16919 SW 15 AVE 09-10-18 INTERIOR FRAMING DAVID MEYER
73 770131 2018120122 BR 03/21/19 3 1353 NW 120 WAY SOUTH POINTE PHASE I UNIT 5-B 18-09-18 WALL ATTACHMENT (FULL) DAVID MEYER
74 770132 2018120164 BR 03/21/19 3 13675 NW 10 PL ARBOR GREENS PH 2 UNIT 1 35-09-18 SHEATHING-FULL DAVID MEYER
75 760164 2018120248 AL 03/21/19 3 6307 NW 191 TER SCATTERED OAKS ESTATES 07-09-18 FINAL INSPECTION MARC BANVILLE
76 764048 2018120376 AP 03/21/19 3 15977 NW 48 PL CHARLESTON PHASE I 15-9-18 SHEATHING-FULL MARC BANVILLE
77 770139 2018120405 BR 03/21/19 3 2801 NW 162 ST A 28-09-18 SHEATHING-FULL MARC BANVILLE
78 763406 2018120444 BR 03/21/19 3 1084 NW 134 WAY ARBOR GREENS PH II, UNIT II 35-09-18 SHEATHING-FULL DAVID MEYER
79 762610 2019010072 AR 03/21/19 3 1218 NW 101 DR BROADMOOR PHASE IV-A 31-09-19 CONCEALED ATTACHMENT (FULL) GREG FERRONE
80 764344 2019010306 RM 03/21/19 03/21/19 75 3 7214 NW 47 CT HIDDEN HILLS REPLAT 21-9-19 CONCEALED ATTACHMENT (FULL) CANCELLED BY APPLICANT
81 764343 2019010306 RM 03/21/19 3 7214 NW 47 CT HIDDEN HILLS REPLAT 21-9-19 ABOVE CEILING MECHANICAL (FULL) MARC BANVILLE
82 764345 2019010306 RM 03/21/19 3 7214 NW 47 CT HIDDEN HILLS REPLAT 21-9-19 ELECTRICAL WALL ROUGH IN (FULL) MARC BANVILLE
83 769005 2019010455 BR 03/21/19 3 15649 NW 14TH LN 33-09-18 ROUGH IN PLUMBING/FULL MARC BANVILLE
84 769003 2019010455 BR 03/21/19 3 15649 NW 14TH LN 33-09-18 TEMPORARY POWER POLE MARC BANVILLE
85 769861 2019010519 RM 03/21/19 03/20/19 75 3 3507 NW 170 ST 21-09-18 WINDOW ATTACHMENT CANCELLED BY APPLICANT
86 765342 2019020157 RN 03/21/19 3 13200 W NEWBERRY RD 02-10-18 FINAL INSPECTION DAVID MEYER
87 765344 2019020158 RN 03/21/19 3 13200 W NEWBERRY RD 02-10-18 FINAL INSPECTION DAVID MEYER
88 770233 2019020185 BR 03/21/19 3 15324 NW 48 PL CHARLESTON PHASE I 15-9-18 ELECTRICAL BONDING & GROUNDING/FULL MARC BANVILLE
89 767742 2019020185 BR 03/21/19 3 15324 NW 48 PL CHARLESTON PHASE I 15-9-18 FOUNDATION FOOTING/FULL MARC BANVILLE
90 767015 2019020469 RR 03/21/19 3 8127 NW 27 BLVD 29-09-19 FINAL INSPECTION MARC BANVILLE
91 768436 2019020574 AP 03/21/19 03/20/19 75 3 2412 NW 106 DR HILLS OF SANTA FE 30-09-19 STRUCTURAL SLAB/FULL CANCELLED BY APPLICANT
92 767589 2019020578 RR 03/21/19 3 6321 MILLHOPPER RD 16-09-19 FINAL INSPECTION MARC BANVILLE
93 770150 2019030039 RR 03/21/19 3 1901 SW 91 ST SHANNON WOODS 08-10-19 FINAL INSPECTION GREG FERRONE
94 769631 2019030069 RR 03/21/19 3 423 NW 101 ST HAMILTON HEIGHTS UNIT 2 06-10-19 FINAL INSPECTION MARC BANVILLE
95 769312 2019030274 RR 03/21/19 03/20/19 75 3 10529 SW 22 AVE CAMBRIDGE FOREST PHASE IV 07-10-19 FINAL INSPECTION CANCELLED BY APPLICANT
96 769410 2019030290 RR 03/21/19 3 1106 SW 76 TER WOODLANDS, THE UNIT 2 08-10-19 FINAL INSPECTION GREG FERRONE
97 770114 2019030385 EL 03/21/19 3 5247 NW 43 LN HUNTINGTON PHASE 1 22-09-19 FINAL INSPECTION MARC BANVILLE
98 770172 2019030416 MP 03/21/19 3 5247 NW 43 LN HUNTINGTON PHASE 1 22-09-19 FINAL INSPECTION MARC BANVILLE
99 757736 2018110053 BR 03/21/19 4 25390 NW 130 AVE TAMIAMI HEIGHTS 4 BLKS 31-40 21-8-17 CEILING ATTACHMENT (FULL) MARC BANVILLE
100 770217 2018110053 BR 03/21/19 4 25390 NW 130 AVE TAMIAMI HEIGHTS 4 BLKS 31-40 21-8-17 WALL ATTACHMENT (FULL) MARC BANVILLE
101 764532 2019010623 MR 03/21/19 4 14707 NW 29 ST 13-08-19 FINAL INSPECTION MARC BANVILLE
102 766942 2019020433 AP 03/21/19 4 29472 NW 142 AVE 18-08-17 FINAL INSPECTION MARC BANVILLE

Print Inspection Sheets by Assigned Inspector

THOMAS MCCARTHY - 21 inspections
DAVID MEYER - 16 inspections
GREG FERRONE - 14 inspections
DAVID G. AMES - 23 inspections
GEORGE GILLESPIE - 2 inspections
MARC BANVILLE - 18 inspections