Current Server Time is 11:36 AM


Today's Inspections

: Wednesday, Aug 21, 2019 ~ Inspections Summary Report ~ 107 Inspections


# Insp. # Permit # Type RequestDate ResultDate Result Zone Address Subdivision STR Description Assigned Inspector
1 794289 2019010406 RM 08/21/19 1 8115 NE 221 ST SANTA FE SHORES 10-09-22 WALL ATTACHMENT (FULL) MARC BANVILLE
2 766172 2019010406 RM 08/21/19 1 8115 NE 221 ST SANTA FE SHORES 10-09-22 BACKER BOARD MARC BANVILLE
3 766170 2019010406 RM 08/21/19 1 8115 NE 221 ST SANTA FE SHORES 10-09-22 CEILING ATTACHMENT (FULL) MARC BANVILLE
4 777682 2019030442 RC 08/21/19 08/21/19 90 1 3011 SW WILLISTON RD 00-10-19 CEILING CONCEALMENT-FULL GREG FERRONE
5 777685 2019030442 RC 08/21/19 08/21/19 90 1 3011 SW WILLISTON RD 00-10-19 FIRE MARSHAL RELEASE (352-384-3103) N/A
6 785308 2019040213 PI 08/21/19 1 3825 SW 69 AVE SAVANNA POINTE PH 2 26-10-19 POOL EQUIPOTENTIAL BOND MARC BANVILLE
7 772707 2019040213 PI 08/21/19 1 3825 SW 69 AVE SAVANNA POINTE PH 2 26-10-19 FOUNDATION FOOTING/FULL MARC BANVILLE
8 787471 2019060295 RC 08/21/19 08/21/19 90 1 1105 SW WILLISTON RD 20-10-20 ELECTRICAL WALL ROUGH IN (FULL) GREG FERRONE
9 785434 2019060563 PI 08/21/19 1 1608 SW 56 PL MALORE GARDENS 00-10-19 POOL BOND/STEEL MARC BANVILLE
10 794317 2019060563 PI 08/21/19 1 1608 SW 56 PL MALORE GARDENS 00-10-19 ROUGH IN PLUMBING/FULL MARC BANVILLE
11 794161 2019070199 RR 08/21/19 1 3901 SE 13 TER ROBINSON HEIGHTS UNIT 3 16-10-20 FINAL INSPECTION MARC BANVILLE
12 787464 2019070359 RN 08/21/19 08/21/19 99 1 708 NW 5TH ST 26-11-20 FINAL INSPECTION GREG FERRONE
13 790106 2019070645 FS 08/21/19 08/21/19 90 1 3011 SW WILLISTON RD 00-10-19 FIRE MARSHAL RELEASE (352-384-3103) N/A
14 790528 2019070900 EL 08/21/19 1 1826 SE 50 ST GREEN GROVE 12-10-20 CHANGE OF SERVICE FINAL MARC BANVILLE
15 791738 2019080120 EL 08/21/19 1 6023 WEST BLVD CANAL SHORES S/D 13-09-22 CHANGE OF SERVICE FINAL MARC BANVILLE
16 772520 2018050683 BR 08/21/19 08/21/19 90 2 10468 SW 32 AVE ESTATES OF WILDS PLANTATION 18-10-19 BACKER BOARD GREG FERRONE
17 749726 2018080170 BR 08/21/19 08/21/19 90 2 6557 SW 74 DR BRYTAN PD PHASE I REPLAT PB33 PG30 28-10-19 CHECK JOB PER B.O. (CALL OFFICE) N/A
18 794270 2018100238 BR 08/21/19 08/21/19 99 2 9397 SW 67 LN LUGANO PH 2 30-10-19 FINAL INSPECTION MARC BANVILLE
19 761436 2018110394 BR 08/21/19 2 5892 SW 83 TER CHESNUT VILLAGE PHASE I 29-10-19 FINAL INSPECTION MARC BANVILLE
20 761711 2018110480 BR 08/21/19 08/21/19 90 2 10575 SW 96 LN MEADOWS ON THE PRAIRIE 06-11-19 CHECK JOB PER B.O. (CALL OFFICE) LYNN HALL
21 789201 2018120085 AR 08/21/19 08/21/19 81 2 5204 SW 77 TER VALWOOD 20-10-19 ELECTRICAL WALL ROUGH IN (FULL) DAVID HOLT
22 789204 2018120085 AR 08/21/19 08/21/19 90 2 5204 SW 77 TER VALWOOD 20-10-19 ABOVE CEILING PLUMBING (FULL) DAVID HOLT
23 789206 2018120085 AR 08/21/19 08/21/19 91 2 5204 SW 77 TER VALWOOD 20-10-19 ABOVE CEILING ELECTRICAL (FULL) DAVID HOLT
24 789202 2018120085 AR 08/21/19 08/21/19 90 2 5204 SW 77 TER VALWOOD 20-10-19 MECHANICAL WALL ROUGH IN/FULL DAVID HOLT
25 789205 2018120085 AR 08/21/19 08/21/19 91 2 5204 SW 77 TER VALWOOD 20-10-19 ABOVE CEILING MECHANICAL (FULL) DAVID HOLT
26 789203 2018120085 AR 08/21/19 08/21/19 90 2 5204 SW 77 TER VALWOOD 20-10-19 FIRE BLOCKING/FIRE STOPPING DAVID HOLT
27 794290 2019010308 BR 08/21/19 2 3453 SW 106 ST ESTATES OF WILDS PLANTATION 18-10-19 SEMI-PERMANENT POWER THOMAS MCCARTHY
28 768724 2019020084 BR 08/21/19 2 6815 SW LUGANO CT LUGANO PH 2 30-10-19 CEILING ATTACHMENT (FULL) MARC BANVILLE
29 793527 2019020084 BR 08/21/19 2 6815 SW LUGANO CT LUGANO PH 2 30-10-19 WALL ATTACHMENT (FULL) MARC BANVILLE
30 773108 2019030119 BR 08/21/19 2 2706 SW 105 ST ESTATES OF WILDS PLANTATION 18-10-19 INSULATION/FULL THOMAS MCCARTHY
31 770096 2019030346 RM 08/21/19 2 5525 SW 104 TER HAILE PLANTATION 13 (SOUTHERLAND CROSSING) 19-10-19 FINAL INSPECTION THOMAS MCCARTHY
32 777201 2019040162 BR 08/21/19 2 9353 SW 67 LN LUGANO PH 2 30-10-19 BACKER BOARD MARC BANVILLE
33 778989 2019040477 BR 08/21/19 2 8015 SW 62 CT CHESNUT VILLAGE PHASE II 30-10-19 INSULATION/FULL MARC BANVILLE
34 786158 2019050490 RM 08/21/19 2 4211 SW 82 TER KENWOOD UNIT 4 17-10-19 DOOR ATTACHMENT MARC BANVILLE
35 780871 2019050490 RM 08/21/19 2 4211 SW 82 TER KENWOOD UNIT 4 17-10-19 ELECTRICAL WALL ROUGH IN (FULL) MARC BANVILLE
36 780869 2019050490 RM 08/21/19 2 4211 SW 82 TER KENWOOD UNIT 4 17-10-19 INTERIOR FRAMING MARC BANVILLE
37 780872 2019050490 RM 08/21/19 2 4211 SW 82 TER KENWOOD UNIT 4 17-10-19 PLUMBING WALL ROUGH IN (FULL) MARC BANVILLE
38 781606 2019050602 MB 08/21/19 2 13060 SW 154 ST 16-11-18 ROUGH IN PLUMBING/FULL THOMAS MCCARTHY
39 781607 2019050602 MB 08/21/19 2 13060 SW 154 ST 16-11-18 STRUCTURAL TIE-DOWN THOMAS MCCARTHY
40 781608 2019050602 MB 08/21/19 2 13060 SW 154 ST 16-11-18 FINAL INSPECTION THOMAS MCCARTHY
41 781611 2019050604 MR 08/21/19 2 13060 SW 154 ST 16-11-18 ROUGH IN MECHANICAL/FULL THOMAS MCCARTHY
42 781612 2019050604 MR 08/21/19 2 13060 SW 154 ST 16-11-18 FINAL INSPECTION THOMAS MCCARTHY
43 788046 2019060365 AR 08/21/19 2 1828 SW 112 ST HAYES GLEN UNIT 2 12-10-18 STRUCTURAL SLAB/FULL THOMAS MCCARTHY
44 786743 2019070221 RM 08/21/19 2 5641 SW 104 TER HAILE PLANTATION 13 (SOUTHERLAND CROSSING) 19-10-19 FINAL INSPECTION THOMAS MCCARTHY
45 793923 2019070529 BR 08/21/19 08/21/19 90 2 SW 32 RD OAKMONT PH 2 13-10-18 SUBCONTRACTOR VERIFICATION REL N/A
46 788697 2019070616 RM 08/21/19 2 8515 SW 55 PL HAILE PLANTATION 1 (LAUREL PARK) 20-10-19 BACKER BOARD THOMAS MCCARTHY
47 793890 2019070616 RM 08/21/19 2 8515 SW 55 PL HAILE PLANTATION 1 (LAUREL PARK) 20-10-19 ROUGH IN PLUMBING/FULL THOMAS MCCARTHY
48 793513 2019070661 EL 08/21/19 2 13060 SW 154 ST 16-11-18 ROUGH IN ELECTRICAL (FULL) THOMAS MCCARTHY
49 793514 2019070661 EL 08/21/19 2 13060 SW 154 ST 16-11-18 NEW SERVICE FINAL THOMAS MCCARTHY
50 789846 2019070785 MR 08/21/19 08/21/19 75 2 9342 SW 33 RD HAILE PLANTATION 34 PH 2 (MILLS GLEN) 18-10-19 FINAL INSPECTION CANCELLED BY APPLICANT
51 793515 2019070810 RR 08/21/19 2 8128 SW 44 TER PRAIRIE POINTE PB K-03 00-10-19 FINAL INSPECTION THOMAS MCCARTHY
52 791026 2019080065 BR 08/21/19 2 12101 SW 29TH PL OAKMONT PHASE III UNIT 1A 13-10-18 STRUCTURAL SLAB/FULL THOMAS MCCARTHY
53 794314 2019080065 BR 08/21/19 2 12101 SW 29TH PL OAKMONT PHASE III UNIT 1A 13-10-18 ELECTRICAL BONDING & GROUNDING/FULL THOMAS MCCARTHY
54 746642 2018070212 BR 08/21/19 08/21/19 90 3 4708 NW 71 BLVD HIDDEN HILLS 21-9-19 CHECK JOB PER B.O. (CALL OFFICE) N/A
55 791433 2019010002 BR 08/21/19 3 11630 SW 24 AVE SUNSET FARMS 12-10-18 ELECTRICAL WALL ROUGH IN (FULL) DAVID HOLT
56 791438 2019010002 BR 08/21/19 3 11630 SW 24 AVE SUNSET FARMS 12-10-18 ABOVE CEILING MECHANICAL (FULL) DAVID HOLT
57 791434 2019010002 BR 08/21/19 3 11630 SW 24 AVE SUNSET FARMS 12-10-18 ABOVE CEILING PLUMBING (FULL) DAVID HOLT
58 791435 2019010002 BR 08/21/19 3 11630 SW 24 AVE SUNSET FARMS 12-10-18 PLUMBING WALL ROUGH IN (FULL) DAVID HOLT
59 791436 2019010002 BR 08/21/19 3 11630 SW 24 AVE SUNSET FARMS 12-10-18 MECHANICAL WALL ROUGH IN/FULL DAVID HOLT
60 791441 2019010002 BR 08/21/19 3 11630 SW 24 AVE SUNSET FARMS 12-10-18 FIRE BLOCKING/FIRE STOPPING DAVID HOLT
61 761687 2019010103 BR 08/21/19 3 1681 NW 121 WAY SOUTH POINTE PHASE I UNIT 5-A 36-09-18 FINAL INSPECTION DAVID MEYER
62 770396 2019010305 BR 08/21/19 3 2626 NW 104 CT HILLS OF SANTA FE PHASE 2 30-09-19 SHOWER PAN DAVID G. AMES
63 770405 2019010305 BR 08/21/19 3 2626 NW 104 CT HILLS OF SANTA FE PHASE 2 30-09-19 WALL ATTACHMENT (FULL) DAVID G. AMES
64 770404 2019010305 BR 08/21/19 3 2626 NW 104 CT HILLS OF SANTA FE PHASE 2 30-09-19 CEILING ATTACHMENT (FULL) DAVID G. AMES
65 770406 2019010305 BR 08/21/19 3 2626 NW 104 CT HILLS OF SANTA FE PHASE 2 30-09-19 BACKER BOARD DAVID G. AMES
66 765795 2019020233 RM 08/21/19 3 112 NW 101 CT FORT CLARK FOREST 06-10-19 FINAL INSPECTION DAVID MEYER
67 793488 2019020272 BR 08/21/19 3 1661 NW 121 WAY SOUTH POINTE PHASE I UNIT 5-A 36-09-18 ABOVE CEILING MECHANICAL (FULL) DAVID MEYER
68 766555 2019020370 RM 08/21/19 3 3819 NW 107 TER COUNTRYSIDE UNIT 1 25-9-18 FINAL INSPECTION DAVID G. AMES
69 794295 2019020553 BC 08/21/19 3 12276 SW 5 AVE AMARIAH PARK 2-10-18 ROUGH IN ELECTRICAL (FULL) DAVID MEYER
70 770580 2019020565 BR 08/21/19 3 914 SW 131 ST TOWN OF TIOGA PHASE 18 11-10-18 SHEATHING-FULL DAVID MEYER
71 771889 2019040088 PI 08/21/19 3 11411 NEWBERRY RD 01-10-18 FOUNDATION FOOTING/FULL DAVID MEYER
72 790713 2019040112 RM 08/21/19 3 126 SW 165 ST MARLBORO FARMS 04-10-18 WINDOW ATTACHMENT DAVID MEYER
73 792512 2019040112 RM 08/21/19 3 126 SW 165 ST MARLBORO FARMS 04-10-18 BACKER BOARD DAVID MEYER
74 794315 2019040112 RM 08/21/19 3 126 SW 165 ST MARLBORO FARMS 04-10-18 SHOWER PAN DAVID MEYER
75 780702 2019040648 RC 08/21/19 08/21/19 99 3 14128 W NEWBERRY RD STE 20 03-10-18 FINAL INSPECTION GREG FERRONE
76 794297 2019040702 BR 08/21/19 3 13021 NW 12 LN WEST END UNITB PHASE2 35-9-18 ROOF SHEATHING-FULL DAVID MEYER
77 794296 2019040702 BR 08/21/19 3 13021 NW 12 LN WEST END UNITB PHASE2 35-9-18 WALL SHEATHING-FULL DAVID MEYER
78 794115 2019050506 BR 08/21/19 3 12311 SW 5 AVE AMARIAH PARK 2-10-18 FINISHED FLOOR ELEVATION VERIFICATION N/A
79 784092 2019050703 RM 08/21/19 3 1313 NW 117 TER RETREAT AT FLETCHER'S MILL PHASE ONE, THE 36-09-18 FINAL INSPECTION DAVID HOLT
80 786116 2019060311 MR 08/21/19 08/21/19 99 3 5309 NW 33 PL 27-09-19 FINAL INSPECTION DAVID HOLT
81 787414 2019060391 BR 08/21/19 3 1220 NW 107 TER PINE HILL ESTATES 36-09-18 ELECTRICAL BONDING & GROUNDING/FULL DAVID MEYER
82 787412 2019060391 BR 08/21/19 3 1220 NW 107 TER PINE HILL ESTATES 36-09-18 FOUNDATION FOOTING/FULL DAVID MEYER
83 787410 2019070354 MR 08/21/19 08/20/19 75 3 717 NW 98 ST 06-10-19 FINAL INSPECTION CANCELLED BY APPLICANT
84 793277 2019070432 BR 08/21/19 3 2546 NW 106 WAY HILLS OF SANTA FE PHASE III AT MEADOWBROOK 30-09-19 ROUGH IN PLUMBING/FULL DAVID G. AMES
85 789379 2019070495 RM 08/21/19 3 10670 NW 32 PL CHARLESTOWNE AT MEADOWBROOK--HILLS OF SANTA FE PH 4 UNIT B 30-09-19 FINAL INSPECTION DAVID G. AMES
86 793358 2019070502 BR 08/21/19 3 929 SW 120 DR GLORIA'S WAY 12-10-18 STRUCTURAL SLAB/FULL DAVID MEYER
87 793357 2019070502 BR 08/21/19 3 929 SW 120 DR GLORIA'S WAY 12-10-18 ELECTRICAL BONDING & GROUNDING/FULL DAVID MEYER
88 792075 2019070572 BM 08/21/19 08/20/19 75 3 12945 NW 12 RD WEST END UNITB PHASE2 35-9-18 SUBCONTRACTOR VERIFICATION REL CANCELLED BY APPLICANT
89 789669 2019070779 RM 08/21/19 08/21/19 90 3 1454 SW 85 TER COBBLEFIELD UNIT V 08-10-19 ROUGH IN PLUMBING/FULL DAVID HOLT
90 789887 2019070813 RR 08/21/19 3 3909 NW 97 BLVD 19-09-19 FINAL INSPECTION DAVID G. AMES
91 790142 2019070840 MR 08/21/19 08/21/19 99 3 9320 NW 11 PL OAK CREST EST 31-09-19 FINAL INSPECTION DAVID HOLT
92 790525 2019080014 PL 08/21/19 3 14849 NW 11 PL WYNDSONG 34-09-18 FINAL INSPECTION DAVID HOLT
93 790962 2019080054 PL 08/21/19 3 14849 NW 11 PL WYNDSONG 34-09-18 FINAL INSPECTION DAVID HOLT
94 584948 2011110020 BR 08/21/19 4 7002 NW 136 ST MALIBU FARMS 11-09-18 INSULATION/FULL DAVID G. AMES
95 784986 2018060465 BR 08/21/19 08/21/19 81 4 18610 NW 138 AVE 20-08-18 WALL TIE AND FLASHING DAVID G. AMES
96 770207 2019010425 BR 08/21/19 08/21/19 90 4 16325 NW 78 AVE UNIVERSIITY AVE PROPERTIES INC 09-09-18 SEMI-PERMANENT POWER DAVID G. AMES
97 794316 2019010425 BR 08/21/19 08/21/19 90 4 16325 NW 78 AVE UNIVERSIITY AVE PROPERTIES INC 09-09-18 DOOR ATTACHMENT DAVID G. AMES
98 794275 2019020191 AR 08/21/19 4 4804 NW 59 ST 21-09-19 FIRE BLOCKING/FIRE STOPPING DAVID G. AMES
99 786308 2019070117 RR 08/21/19 08/21/19 97 4 24110 NW 196 TER BELLAMY ROAD ESTATES 18-7-18 IN PROGRESS DAVID G. AMES
100 789225 2019070307 MB 08/21/19 08/21/19 99 4 3241 NE 156 AVE WOODS OF MONTEOCHA 15-08-20 MOBILE HOME FINAL DAVID G. AMES
101 794280 2019070672 RM 08/21/19 08/21/19 75 4 27104 NW 203 PL SANTA FE RIVER ESTATES 32-07-17 WINDOW ATTACHMENT CANCELLED BY APPLICANT
102 794281 2019070672 RM 08/21/19 08/21/19 91 4 27104 NW 203 PL SANTA FE RIVER ESTATES 32-07-17 STRUCTURAL FRAMING/PARTIAL DAVID G. AMES
103 789727 2019070790 RR 08/21/19 08/21/19 99 4 7704 NW 179 ST SOUTHERN COMFORT ESTATES 08-09-18 FINAL INSPECTION DAVID G. AMES
104 790132 2019070814 RM 08/21/19 08/21/19 90 4 15534 NW 25 TER WOOD MEADOWS 13-08-19 SUBCONTRACTOR VERIFICATION REL N/A
105 791320 2019080089 RR 08/21/19 4 5524 NW 67 ST THORNEHILL 16-09-19 FINAL INSPECTION DAVID G. AMES
106 792435 2019080188 RR 08/21/19 4 14012 NW COUNTY RD 237 21-08-19 IN PROGRESS DAVID G. AMES
107 792631 2019080221 MR 08/21/19 08/21/19 99 4 20104 OLD BELLAMY RD 34-07-18 FINAL INSPECTION DAVID G. AMES

Print Inspection Sheets by Assigned Inspector

MARC BANVILLE - 20 inspections
GREG FERRONE - 5 inspections
LYNN HALL - 1 inspection
DAVID HOLT - 18 inspections
THOMAS MCCARTHY - 17 inspections
DAVID MEYER - 15 inspections
DAVID G. AMES - 20 inspections


v 1.0.3.188